35 Ill. Adm. Code 225.470
Clean Air Set-Aside (CASA) Applications
Section
225.470 Clean Air Set-Aside (CASA) Applications
a) A project sponsor may
request allowances if the project commenced construction on or after the dates
listed in this subsection. The project sponsor may request and be allocated
allowances from more than one CASA category for a project, if applicable.
1) Demand side management,
energy efficient new construction, and supply side energy efficiency and
conservation projects that commenced construction on or after January 1, 2003;
2) Fluidized bed coal
combustion projects, highly efficient power generation operations projects, or
renewable energy emission units, that commenced construction on or after January
1, 2001; and
3) All other projects on or
after July 1, 2006.
b) Beginning with the 2009
control period and each control period thereafter, a project sponsor may
request allowances from the CASA. The application must be submitted to the
Agency by May 1 of the control period for which the allowances are being
requested.
c) The allocation will be
based on the electricity conserved or generated in the control period preceding
the calendar year in which the application is submitted. To apply for a CAIR
NO
x
allocation from the CASA, project sponsors must provide the
Agency with the following information:
1) Identification of the
project sponsor, including name, address, type of organization, certification
that the project sponsor has met the definition of "project sponsor"
as set forth in Section 225.130, and names of the principals or corporate
officials.
2) The number of the CAIR
NO
x
general or compliance account for the project and the name of
the associated CAIR account representative.
3) A description of the
project or projects, location, the role of the project sponsor in the projects,
and a general explanation of how the amount of energy conserved or generated
was measured, verified, and calculated, and the number of allowances requested
with the supporting calculations. The number of allowances requested will be
calculated using the applicable formula from Section 225.470(b).
4) Detailed information to
support the request for allowances, including the following types of
documentation for the measurement and verification of the NO
x
emissions reductions, electricity generated, or electricity conserved using
established measurement verification procedures, as applicable. The
measurement and verification required will depend on the type of project
proposed.
A) As applicable,
documentation of the project's base and control period conditions and resultant
base and control period energy data, using the procedures and methods included
in M&V Guidelines: Measurement and Verification for Federal Energy
Projects, incorporated by reference in Section 225.140, or other method
approved by the Agency. Examples include:
i) Energy consumption and
demand profiles;
ii) Occupancy type;
iii) Density and periods;
iv) Space conditions or
plant throughput for each operating period and season. (For example, in a
building this would include the light level and color, space temperature,
humidity and ventilation);
v) Equipment inventory,
nameplate data, location, and condition; and
vi) Equipment operating
practices (schedules and set points, actual temperatures/pressures);
B) Emissions data,
including, if applicable, CEMS data;
C) Information for rated-energy
efficiency, including supporting documentation and calculations; and
D) Electricity, in MWh
generated or conserved for the applicable control period.
5) Notwithstanding the
requirements of subsection (c)(4) of this Section, applications for fewer than
five allowances may propose other reliable and applicable methods of
quantification acceptable to the Agency.
6) Any additional
information requested by the Agency to determine the correctness of the
requested number of allowances, including site information, project
specifications, supporting calculations, operating procedures, and maintenance
procedures.
7) The following
certification by the responsible official for the project sponsor and the
applicable CAIR account representative for the project:
"I
am authorized to make this submission on behalf of the project sponsor and the
holder of the CAIR NO
x
general account or compliance account for
which the submission is made. I certify under penalty of law that I have
personally examined, and am familiar with, the statements and information
submitted in this application and all its attachments. Based on my inquiry of
those individuals with primary responsibility for obtaining the information, I
certify that the statements and information are to the best of my knowledge and
belief true, accurate, and complete. I am aware that there are significant
penalties for submitting false statements and information or omitting required
statements and information."
d) A project sponsor may
request allowances from the CASA for each project for a total number of control
periods not to exceed the number of control periods listed in this subsection.
After a project has been allocated allowances from the CASA, subsequent
requests for the project from the project sponsor must include the information
required by subsections (c)(1), (c)(2), (c)(3) and (c)(7) of this Section, a
description of any changes, or further improvements made to the project, and
information specified in subsections (c)(5) and (c)(6) as specifically
requested by the Agency.
1) For energy efficiency
and conservation projects (except for efficient operation and renewable energy
projects), for a total of eight control periods.
2) For
early adopter projects, for a total of ten control periods.
3) For air pollution
control equipment upgrades, for a total of 15 control periods.
4) For renewable energy
projects, clean coal technology, and highly efficient power generation
projects, for each year that the project is in operation.
e) A project sponsor must
keep copies of all CASA applications and the documentation used to support the
application for at least five years.