35 Ill. Adm. Code 225.550
Monitoring, Recordkeeping and Reporting Requirements for Gross Electrical Output and Useful Thermal Energy
Section
225.550 Monitoring, Recordkeeping and Reporting Requirements for Gross
Electrical Output and Useful Thermal Energy
a) By January 1, 2008, or
by the date of commencing commercial operation, whichever is later, the owner
or operator of the CAIR NO
x
Ozone Season unit must operate a system
for accurately measuring gross electrical output that is consistent with the
requirements of either 40 CFR 60 or 75; must measure gross electrical output in
MWh using such a system; and must record the output of the measurement system
at all times. If a generator is served by two or more units, the information
to determine each unit's heat input for that control period must also be
recorded, so as to allow each unit's share of the gross electrical output to be
determined. If heat input data is used, the owner or operator must comply with
the applicable provisions of 40 CFR 75, as incorporated by reference in Section
225.140.
b) For a CAIR NO
x
Ozone Season unit that is a cogeneration unit, by January 1, 2008, or by the
date the CAIR NO
x
Ozone Season unit commences to produce useful
thermal energy, whichever is later, the owner or operator of the unit with
cogeneration capabilities must install, calibrate, maintain, and operate meters
for steam flow in lbs/hr, temperature in degrees Fahrenheit, and pressure in
PSI, to measure and record the useful thermal energy that is produced, in
mmBtu/hr, on a continuous basis. Owners and operators of a CAIR NO
x
Ozone Season unit that produces useful thermal energy but uses an energy
transfer medium other than steam, e.g., hot water or glycol, must install,
calibrate, maintain, and operate the necessary meters to measure and record the
necessary data to express the useful thermal energy produced, in mmBtu/hr, on a
continuous basis. If the CAIR NO
x
Ozone Season unit ceases to
produce useful thermal energy, the owner or operator may cease operation of these
meters, provided that operation of such meters must be resumed if the CAIR NO
x
Ozone Season unit resumes production of useful thermal energy.
c) The owner or operator of
a CAIR NO
x
Ozone Season unit must either report gross electrical
output data to the Agency or comply with the applicable provisions for
providing heat input data to USEPA as follows:
1) By September 15, 2007,
the gross electrical output for control periods 2001, 2002, 2003, 2004 and
2005, if available, and the unit's useful thermal energy data, if applicable.
If a generator is served by two or more units, the documentation needed to
determine each unit's share of the heat input of such units for that control
period must also be submitted. If heat input data is used, the owner or
operator must comply with the applicable provisions of 40 CFR 75, as
incorporated by reference in Section 225.140.
2) By June 1, 2008, the
gross electrical output for control periods 2006 and 2007, if available, and
the unit's useful thermal energy data, if applicable. If a generator is served
by two or more units, the documentation needed to determine each unit's share
of the heat input of such units for that control period must also be
submitted. If heat input data is used, the owner or operator must comply with
the applicable provisions of 40 CFR 75, as incorporated by reference in Section
225.140.
d) Beginning with 2008, the
CAIR designated representative of the CAIR NO
x
Ozone Season unit
must submit to the Agency quarterly, by no later than April 30, July 31,
October 31, and January 31 of each year, information for the CAIR NO
x
Ozone Season unit's gross electrical output, on a monthly basis for the prior
quarter, and, if applicable, the unit's useful thermal energy for each month.
e) The owner or operator of
a CAIR NO
x
Ozone Season unit must maintain on-site the monitoring
plan detailing the monitoring system, maintenance of the monitoring system,
including quality assurance activities pursuant to the requirements of 40 CFR
60 or 75, as applicable, including the appropriate provisions for the
measurement of gross electrical output for the CAIR NO
x
Ozone Season
Trading Program and, if applicable, for new units. The monitoring plan must
include, but is not limited to:
1) A description of the
system to be used for the measurement of gross electrical output pursuant to
Section 225.550(a), including a list of any data logging devices, solid-state
kW meters, rotating kW meters, electromechanical kW meters, current
transformers, transducers, potential transformers, pressure taps, flow venturi,
orifice plates, flow nozzles, vortex meters, turbine meters, pressure
transmitters, differential pressure transmitters, temperature transmitters,
thermocouples, resistance temperature detectors, and any equipment or methods
used to accurately measure gross electrical output.
2) A certification
statement by the CAIR designated representative that all components of the
gross electrical output system have been tested to be accurate within three
percent and that the gross electrical output system is accurate to within ten
percent.
f) The owner or operator of
a CAIR NO
x
Ozone Season unit must retain records for at least five
years from the date the record is created or the data is collected under
subsections (a) and (b) of this Section, and the reports are submitted to the
Agency and USEPA in accordance with subsections (c) and (d) of this Section.
The owner or operator of a CAIR NO
x
Ozone Season unit must retain
the monitoring plan required in subsection (e) of this Section for at least
five years from the date that it is replaced by a new or revised monitoring
plan.