35 Ill. Adm. Code 219.422
Inspection Program Plan for Leaks
Section 219
Section 219.422 Inspection
Program Plan for Leaks
The owner or operator of a
synthetic organic chemical or polymer manufacturing plant subject to Section
219.421 of this Part shall prepare an inspection program plan which contains,
at a minimum:
a) An identification of all components and the period in which
each will be monitored pursuant to Section 219.423 of this Part.
b) The format for the monitoring log required by Section 219.425
of this Part.
c) A description of the monitoring equipment to be used when
complying with Section 219.423 of this Part, and
d) A description of the methods to be used to identify all
pipeline valves, pressure relief valves in gaseous service, all leaking
components, and components exempted under Section 219.423(j) of this Part such
that they are obvious and can be located by both plant personnel performing
monitoring and Agency personnel performing inspections.