35 Ill. Adm. Code 220.250
Operational Standards for Collection and Control Systems
Section 220
Section 220.250 Operational
Standards for Collection and Control Systems
Each owner or operator of an MSW
landfill with a gas collection and control system shall:
a) Operate the collection system such that gas is collected from
each area, cell, or group of cells in the MSW landfill in which the initial
solid waste has been in place for:
1) 5 years or more if active; or
2) 2 years or more if closed or at final grade.
b) Operate the collection system with negative pressure at each
wellhead except under the following conditions:
1) A fire or increased well temperature. The owner or operator
shall record instances when positive pressure occurs in efforts to avoid a
fire. These records shall be submitted with the annual reports as provided in
Section 220.280(e)(1) of this Subpart.
2) Use of a geomembrane or synthetic cover. The owner or
operator shall develop pressure limits associated with such a cover that must
be approved by the Agency.
3) A decommissioned well. A well may experience a static positive
pressure after shut down to accommodate for declining flows. All design
changes shall be approved by the Agency.
c) Operate each interior wellhead in the collection system with a
landfill gas temperature less than 55°C (131°F) and with either a nitrogen
level less than 20 percent or an oxygen level less than 5 percent. The owner
or operator may establish a higher operating temperature, nitrogen, or oxygen
value at a particular well. A higher operating value demonstration that
provides supporting data to show that the elevated parameter does not cause
fires or significantly inhibit anaerobic decomposition by killing methagens
must be approved by the Agency before such higher operating value may be used.
Operating values shall be determined as follows:
1) The nitrogen level shall be determined using Method 3C, Appendix
A, 40 CFR 60, incorporated by reference in Section 220.130 of this Part.
2) The oxygen level shall be determined by an oxygen meter using
Method 3A, Appendix A, 40 CFR 60, incorporated by reference in Section 220.130
of this Part, except that:
A) The span shall be set so that the regulatory limit is between
20 and 50 percent of the span;
B) A data recorder is not required;
C) Only two calibration gases are required, a zero and span, and
ambient air may be used as the span;
D) A calibration error check is not required; and
E) The allowable sample bias, zero drift, and calibration drift
are plus or minus 10 percent.
d) Operate the collection system so that the methane
concentration is less than 500 ppm above background at the surface of the landfill.
To determine if this level is exceeded, the owner or operator shall conduct
surface testing around the perimeter of the collection area and along a pattern
that traverses the landfill at 30-meter intervals and where visual observations
indicate elevated concentrations of landfill gas, such as distressed vegetation
and cracks or seeps in the cover. An initial surface monitoring design plan
shall be developed and included as part of the operating permit application
(e.g., a CAAPP permit application) that includes a topographical map with the
monitoring route and the rationale for any site-specific deviations from the
30-meter intervals. Areas with steep slopes or other dangerous areas may be
excluded from the surface testing. The monitoring plan shall be updated as
necessary. Updated copies must be sent to the Agency and kept on-site at the
MSW landfill.
e) Operate the gas collection and control system such that all
collected gases are vented to a control system designed and operated in
compliance with Sections 220.230, 220.250, and 220.270 of this Subpart. In the
event the collection or control system is inoperable, the gas mover system
shall be shut down and all valves in the collection and control system
contributing to venting of the gas to the atmosphere shall be closed within 1
hour.
f) Operate the gas collection and control or treatment system at
all times, except during shutdown or malfunction, provided that the duration of
start-up, shutdown, or malfunction must not exceed 5 days for collection
systems and must not exceed 1 hour for treatment or control devices.
g) If monitoring demonstrates that the operational requirements
in subsection (b), (c), or (d) of this Section are not met, take corrective
action as specified in Section 220.240(a)(3), (a)(5), or (c)(4) of this
Subpart. If such corrective actions are taken as specified in Section
220.240(a)(3), (a)(5), or (c)(4) of this Subpart, the monitored exceedence is
not a violation of the operational requirements in this Section.
h) The collection and control system may be capped or removed
provided:
1) The landfill is no longer accepting solid waste;
2) A system removal report has been submitted to the Agency, as
provided in Section 220.280(d) of this Subpart;
3) The collection and control system has been operating a minimum
of 15 years;
4) The calculated NMOC gas produced by the landfill is less than
50 Mg/yr on three successive test dates, pursuant to the procedures specified
in Section 220.260(b) of this Subpart. The test dates shall be no less than 90
days apart, and no more than 180 days apart; and
5) The system is not required to satisfy any applicable
requirement of 35 Ill. Adm. Code.Subtitle G.