35 Ill. Adm. Code 229.140
Methods and Procedures for Performance Testing
Section 229
Section 229.140 Methods and
Procedures for Performance Testing
This Section applies during all
performance tests.
a) The owner or operator of an HMIWI shall provide, or cause to
be provided, the facilities for emission testing specified in 40 CFR 60.8(e),
incorporated by reference at Section 229.104(c) of this Part.
b) When conducting a performance test for an HMIWI, the owner or
operator shall:
1) Test an HMIWI at the waste charging rate specified in its
permit or, if no permit has been issued, in its permit application;
2) Burn representative waste streams that are typically combusted
in that HMIWI;
3) Conduct testing during periods that are inclusive of maximum
emissions of the HMIWI and not during periods of startup, malfunction, or
shutdown; and
4) Weigh the amount of waste combusted for each run of the
performance test before charging the waste to an HMIWI to within 1.0 percent
accuracy.
c) The owner or operator of an HMIWI shall submit a test plan to
the Agency at least 45 days before conducting a performance test pursuant to
this Part. Performance test plans shall include the following:
1) The proposed date of the performance test;
2) A roster of testing personnel, which provides information
concerning their testing experience;
3) A description of the specific conditions under which the test
will be performed, including, at a minimum:
A) Why these conditions will be representative of the operation
and include maximum emissions of the HMIWI; and
B) The means by which the operating parameter values will be
determined;
4) A technical description of the HMIWI being tested;
5) The parameters and pollutants that will be monitored during
the performance test; and
6) The quality assurance procedures that will be followed during
the performance test.
d) The owner or operator of an HMIWI shall give the Agency 5 days
written notice prior to actually conducting any performance testing required by
the provisions of this Part.
e) Testing conducted pursuant to this Part shall be according to
the procedures and test methods specified for the measurement of each pollutant
in Appendix C of this Part.
f) Notwithstanding subsection (e) of this Section, alternate
testing methods may be used if approved by the Agency in a permit and approved
by USEPA.
g) Any use of a bypass stack during a performance test shall
invalidate the results of that run.