35 Ill. Adm. Code 261.120
Definitions
Section 261.120 Definitions
For the purposes of this Part, the following
definitions apply:
Agency – Illinois Environmental
Protection Agency.
ARRA − American Recovery and
Reinvestment Act of 2009 (Public Law 111-5).
CMAQ - Congestion Mitigation and
Air Quality Improvement Program (23 USC 149).
DERA – Diesel Emissions Reduction
Act (42 USC 16131 et seq.).
Director – Director of the Agency.
Engine repower – a new, rebuilt,
or remanufactured engine configuration that has been certified or otherwise
allowed by the United States Environmental Protection Agency (USEPA) and that
meets or is rebuilt or remanufactured to a more stringent set of engine
emission standards, as determined by USEPA.
Grant agreement – the contractual
agreement between the Agency and grant recipient governing the grant, which
includes at a minimum a project scope of work and grant terms and conditions.
Grant applicant – a person or
entity that has applied for a grant from the Agency under this Part.
Grant period – the period of time
specified in the grant agreement for performance of the project scope of work.
Grant recipient – a grant
applicant that has been provided a project confirmation letter from the Agency
for a grant.
Gross vehicle weight rating (GVWR)
– the total vehicle weight, including the maximum load, as designated by the
original equipment manufacturer.
Off-road diesel-powered vehicle or
equipment – a self-propelled diesel-powered vehicle, or diesel-powered
equipment, that is not an on-road diesel-powered vehicle or on-road
diesel-powered equipment. This includes, but is not limited to, locomotives,
marine vessels, and vehicles or equipment used in agriculture, construction, or
mining.
On-road diesel-powered vehicle or
equipment − a self-propelled diesel-powered vehicle, or diesel-powered
equipment, designed for operation on a street or highway. This includes, but
is not limited to, buses and trucks.
Project amendment confirmation letter
– a written letter from the Agency to the grant recipient, including the signed
grant amendment, approving revisions to a grant agreement.
Project confirmation letter – a
written letter from the Agency to the grant recipient, including the signed
grant agreement, authorizing the grant recipient to commence the project scope
of work.
Project scope of work – the grant
project activities or tasks identified by the Agency in the grant agreement for
which the grant recipient may expend grant funds.
SEP – a supplemental environmental
project contained in an enforceable consent decree.
Sub-agreement – a written
agreement between the grant recipient and another party to perform all or part
of the project scope of work for which a grant is provided, including, but not
limited to, contracts and subcontracts.
Verified idle reduction technology
– a technology or device that is installed on a vehicle or at a location, is
designed to provide services to the vehicle or equipment that would otherwise
require the operation of the main drive engine while the vehicle or equipment
is parked or remains stationary, reduces unnecessary idling of such vehicle or
equipment, allows for the reduction in emissions, and is verified or otherwise
approved by USEPA.
Verified retrofit technology – a
pollution control device verified or otherwise approved by USEPA.