35 Ill. Adm. Code 270.201
Schedule for Submission of Initial CAAPP Applications for Existing CAAPP Sources
Section 270
Section 270.201 Schedule for
Submission of Initial CAAPP Applications for Existing CAAPP Sources
An owner or operator of an
existing CAAPP source shall submit to the Agency a complete initial CAAPP
application for the source no later than the applicable date specified below:
a) An owner or operator of a CAAPP source with the following SIC
codes shall submit its initial complete CAAPP application no later than 3
months after the effective date of the CAAPP: 70, 80, 82, 92, and 97
(institutions); 44, 50, and 51 (material handling); 10, 12, and 14 (mining);
and 2951 (asphalt plants);
b) An owner or operator of a CAAPP source with the following SIC
codes shall submit its initial complete CAAPP application no later than 6
months after the effective date of the CAAPP: 26 (paper and allied products);
27 (printing and publishing); 46, 494, and 495 (pipelines and utilities other
than natural gas pipelines); 491 and 493 (electric utilities); and 32 (mineral
products);
c) An owner or operator of a CAAPP source not included in (a) or
(b) above or (d) below shall submit its initial complete CAAPP application no
later than 9 months after the effective date of the CAAPP; and
d) An owner or operator of a CAAPP source with the following SIC
codes shall submit its initial complete CAAPP application no later than 12
months after the effective date of the CAAPP: 20 (agricultural products); 28
(chemicals); 29 (petroleum refining not including 2951); 33 (iron and steel
products); and 37 (transportation equipment).