35 Ill. Adm. Code 270.201

Schedule for Submission of Initial CAAPP Applications for Existing CAAPP Sources

Year: 2026Length: 255 wordsOfficial source
Section 270 Section 270.201  Schedule for Submission of Initial CAAPP Applications for Existing CAAPP Sources An owner or operator of an existing CAAPP source shall submit to the Agency a complete initial CAAPP application for the source no later than the applicable date specified below: a)         An owner or operator of a CAAPP source with the following SIC codes shall submit its initial complete CAAPP application no later than 3 months after the effective date of the CAAPP: 70, 80, 82, 92, and 97 (institutions); 44, 50, and 51 (material handling); 10, 12, and 14 (mining); and 2951 (asphalt plants); b)         An owner or operator of a CAAPP source with the following SIC codes shall submit its initial complete CAAPP application no later than 6 months after the effective date of the CAAPP: 26 (paper and allied products); 27 (printing and publishing); 46, 494, and 495 (pipelines and utilities other than natural gas pipelines); 491 and 493 (electric utilities); and 32 (mineral products); c)         An owner or operator of a CAAPP source not included in (a) or (b) above or (d) below shall submit its initial complete CAAPP application no later than 9 months after the effective date of the CAAPP; and d)         An owner or operator of a CAAPP source with the following SIC codes shall submit its initial complete CAAPP application no later than 12 months after the effective date of the CAAPP: 20 (agricultural products); 28 (chemicals); 29 (petroleum refining not including 2951); 33 (iron and steel products); and 37 (transportation equipment).
35 Ill. Adm. Code 270.201: Schedule for Submission of Initial CAAPP Applications for Existing CAAPP Sources | Justis AI