35 Ill. Adm. Code 276.803
Agency Investigation
Section 276
Section 276.803 Agency
Investigation
a) The Director of the Agency or the Director's designee shall
appoint an Agency employee to investigate every grievance regarding the failure
of an emissions test or the denial of a waiver submitted to the Agency in
accordance with this Part.
b) The Agency's investigation shall be concluded within 45 days
after the receipt of the grievance petition.
c) Within the 45 day investigation period, the Agency shall submit
to the petitioner
,
and affected inspector or station, its written
determination indicating the correctness or incorrectness of the decision that
precipitated the grievance. In conducting the investigation, the Agency may
require the petitioner to present the vehicle for inspection by the Agency or
its designated agent.
d) The Agency's written determination shall include a statement
of the facts relied upon and the legal and technical issues decided by the
Agency in making its determinations.
e) The Agency's written determination may also require that an
employee of the Agency or its designee:
1) Issue an emissions compliance certificate;
2) Reinspect the vehicle;
3) Apply the standards that the Agency has determined to be
applicable; or
4) Take any other action that the Agency deems to be appropriate.
f) If the Agency's investigation determines that a part needed to
complete the necessary and appropriate repairs is unavailable after contacting
at least 3 independent sources, one of which shall be the original equipment
manufacturer, a waiver may be granted.