35 Ill. Adm. Code 306.502
Alton Combined Sewer Overflow Discharges
Section 306
Section 306.502Â Alton
Combined Sewer Overflow Discharges
a)Â Â Â Â Â Â Â Â The discharge from the Piasa-State Street Sewer at Mississippi
River mile 202.64 is not subject to 35 Ill. Adm. Code 304.106, 304.120, 304.121
and 304.124 during the following conditions:
1)Â Â Â Â Â Â Â Â Before replacement of the existing Locks and Dam 26, when the
tailwater elevation exceeds 415.3 Mean Sea Level (MSL); or
2)Â Â Â Â Â Â Â Â After replacement of Locks and Dam 26, when the pool level
exceeds elevation 420 MSL at Mississippi River miles 203.12 and 203.22 (Piasa
and State Street Outlets relocated).
b)Â Â Â Â Â Â Â Â Discharges from the City of Alton at Mississippi River miles
201.66 (Shields Valley), 202.24 (Central Avenue), 203.12 (Piasa Outlet), 203.22
(State Street Outlet), 203.61 (Summit Street), 203.87 (Bluff Street) and 204.30
(Turner Tract), are subject to the following conditions:
1)Â Â Â Â Â Â Â Â The overflow structures and the associated interceptor sewer must
be protected against intrusion by flood waters and be maintained operational at
flood stages from Mississippi River backflow for a 25-year Mississippi River
flood stage, except as follows:
Overflow
Structure
River
Mile
Protection Level
Mean Sea Level (MSL)
River Stage
Piasa Outlet
203.12
420.0
State Street
Outlet
203.22
420.0
Summit Street
203.61
426.7
Bluff Street
203.87
426.7
Turner Tract
204.30
426.7
2)Â Â Â Â Â Â Â Â The City of Alton must maintain the south side interceptor
sewer system in working condition to ensure that the system will flow at a
maximum capacity.
3)Â Â Â Â Â Â Â Â No later than the date of completion of Lock and Dam 26, the
south side interceptor pump station must be upgraded to a design capacity of a
minimum of 13.7 million gallons per day.
c)Â Â Â Â Â Â Â Â Discharges from the combined sewer overflows designated in
subsection (b) are not subject to the treatment requirements of Section
306.305(a) and (b) provided that:
1)Â Â Â Â Â Â Â Â The City of Alton maintains the south side interceptor sewer
system in working condition to ensure that the system will flow at a maximum
capacity.
2)Â Â Â Â Â Â Â Â The South Side interceptor pump station must be upgraded to a
design capacity of a minimum of 13.7 million gallons per day.