35 Ill. Adm. Code 307.3912

Finishing

Last amended: 2023Year: 2026Length: 165 wordsOfficial source
Section 307 Section 307.3912  Finishing a)         Applicability.  This Section applies to discharges resulting from the drying, planing, dipping, staining, end coating, moisture proofing, fabrication, or by-product utilization timber processing operations not otherwise covered by specific guidelines and standards. b)         Specialized Definitions.  None. c)         Existing Sources 1)         The Board incorporates by reference 40 CFR 429.135 (2003).  This incorporation includes no later amendments or editions. 2)         No person subject to the pretreatment standards incorporated by reference in subsection (c)(1) may cause, threaten, or allow the discharge of any contaminant to a POTW in violation of those standards. d)         New Sources 1)         The Board incorporates by reference 40 CFR 429.136 (2003).  This incorporation includes no later amendments or editions. 2)         No person subject to the pretreatment standards incorporated by reference in subsection (d)(1) may cause, threaten, or allow the discharge of any contaminant to a POTW in violation of those standards. 3)         "New source" means any building, structure, facility, or installation whose construction commenced after October 31, 1979.
35 Ill. Adm. Code 307.3912: Finishing | Justis AI