35 Ill. Adm. Code 309.205

Joint Construction and Operating Permits

Last amended: 2023Year: 2026Length: 47 wordsOfficial source
Section 309 Section 309.205  Joint Construction and Operating Permits If the Agency determines that a proposed treatment works, pretreatment works, sewer, or wastewater source is sufficiently standard to obviate the need for separate construction and operating permits, the Agency may issue a joint construction and operating permit.
35 Ill. Adm. Code 309.205: Joint Construction and Operating Permits | Justis AI