35 Ill. Adm. Code 325.435
Transfer of Ownership and Fees
Section 325.435 Transfer of Ownership and Fees
a) When
there is a change in ownership or operational control at a permitted facility
subject to one or more of the fees in this Part, the new owner or operator will
become liable for all fees that accrue as of the date of transfer of permit
coverage.
b) Transfer
of permit coverage may occur only in the following ways (40 CFR 112.61):
1) The permit is modified
or revoked and reissued;
2) The permit is
transferred by minor modification; or
3) The permit is
transferred by automatic transfer.
c) Transfer
by Minor Modification. A change in ownership or operational control of a
facility will be considered a minor modification of an NPDES permit under 40
CFR 122.63(d) provided that no other change in the permit is necessary, all
past due fees have been paid, and a written agreement containing a specific
date for transfer of permit responsibility, coverage and liability between the
current and new permittees has been submitted to the Agency.
d) Transfer
by Automatic Transfer. An NPDES permit will be automatically transferred
pursuant to 40 CFR 122.61(b) if all of the following conditions are met:
1) The
current permittee notifies the Agency at least 30 days in advance of the
proposed transfer date;
2) The
notice includes a written agreement between the existing and new permittees
containing a specific date for transfer of permit responsibility, coverage and
liability between them;
3) All past due fees have
been paid; and
4) The
Agency does not notify the existing and proposed permittees of its intent to
modify or revoke and reissue the permit. If this notice is not received, the
automatic transfer is effective on the date specified in the agreement between
the parties.