35 Ill. Adm. Code 370.1200
Phosphorus Removal by Chemical Treatment
Section 370
Section 370.1200 Phosphorus
Removal by Chemical Treatment
a) General
1) Method
Addition of lime or the salts of aluminum or iron may be used
for the chemical removal of soluble phosphorus. The phosphorus reacts with the
calcium, aluminum or iron ions to form insoluble compounds. These insoluble
compounds may be flocculated with or without the addition of a coagulant aid
such as a polyelectrolyte to facilitate separation by sedimentation.
2) Design Basis
A) Preliminary Testing
Laboratory, pilot or full-scale trial of various chemical
feed systems and treatment processes are recommended to determine the
achievable performance level, cost-effective design criteria, and ranges of
required chemical dosages.
B) System Flexibility
Systems shall be designed with sufficient flexibility to
allow for several operational adjustments in chemical feed location, chemical
feed rates, and for feeding alternate chemical compounds.
b) Process Requirements
1) Dosage
The required chemical dosage shall include the amount needed
to react with the phosphorus in the wastewater, the amount required to drive
the chemical reaction to the desired state of completion, and the amount
required due to inefficiencies in mixing or dispersion. Excessive chemical
dosage should be avoided.
2) Chemical Selection
A) The choice of lime or the salts of aluminum or iron should be
based on the wastewater characteristics and the economics of the total system.
B) When lime is used it may be necessary to neutralize the high pH
prior to subsequent treatment in secondary biological systems or prior to
discharge in those flow schemes where lime treatment is the final step in the
treatment process.
3) Chemical Feed Points
Selection of chemical feed points shall include consideration
of the chemicals used in the process, necessary reaction times between chemical
and polyelectrolyte additions, and the wastewater treatment processes and
components utilized. Considerable flexibility in feed location should be
provided, and multiple feed points are recommended.
4) Flash Mixing
Each chemical must be mixed rapidly and uniformly with the
flow stream. Where separate mixing basins are provided, they should be
equipped with mechanical mixing devices. The detention period should be at
least 30 seconds.
5) Flocculation
The particle size of the precipitate formed by chemical
treatment may be very small. Consideration should be given in the process
design to the addition of synthetic polyelectrolytes to aid settling. The
flocculation equipment should be adjustable in order to obtain optimum floc
growth, control deposition of solids, and prevent floc destruction.
6) Liquid - Solids Separation
A) The velocity through pipes or conduits from flocculation basins
to settling basins should not exceed 1,5 feet per second in order to minimize
floc destruction. Entrance works to settling basins should also be designed to
minimize floc shear.
B) Settling basin design shall be accordance with criteria
outlined in Subpart G. For design of the sludge handling system, special
consideration should be given to the type and volume of sludge generated in the
phosphorus removal process.
7) Filtration
Effluent filtration shall be considered where effluent
phosphorus concentrations of less than 1 mg/1 must be achieved.
c) Feed Systems
1) Location
A) All liquid chemical mixing and feed installations should be
installed on corrosion-resistant pedestals and elevated above the highest
liquid level anticipated during emergency conditions. Refer to Section
370.147(b)(2)(A).
B) Lime feed equipment should be located so as to minimize the
length of slurry conduits. All slurry conduits shall be accessible for
cleaning.
2) Liquid Chemical Feed Pumps
A) Liquid chemical feed pumps should be of the positive
displacement type with variable feed rate. Pumps shall be selected to feed the
full range of chemical quantities required for the phosphorus mass loading
conditions anticipated with the largest unit out of service.
B) Screens and valves shall be provided on the chemical feed pump
suction lines.
C) An air break or anti-siphon device shall be provided where the
chemical solution stream discharges to the transport water stream to prevent an
induction effect resulting in overfeed.
D) Consideration shall be given to providing pacing equipment to
optimize chemical feed rates.
3) Dry Chemical Feed System
A) Each dry chemical feeder shall be equipped with a dissolver
which is capable of providing a minimum 5-minute retention at the maximum feed
rate.
B) Polyelectrolyte feed installations should be equipped with two
solution vessels and transfer piping for solution make-up and daily operation.
C) Make-up tanks shall be provided with an eductor funnel or other
appropriate arrangement for wetting the polymer during the preparation of the
stock feed solution. Adequate mixing should be provided by a large-diameter
low-speed mixer.
d) Storage Facilities
1) Size
Storage facilities shall be sufficient to insure that an
adequate supply of the chemical is available at all times. Exact size required
will depend on size of shipment, length of delivery time, and process
requirements. Storage for a minimum of a 10-day supply should be provided.
2) Location
A) The liquid chemical storage tanks and tank fill connections
shall be located within a containment structure having a capacity exceeding the
total volume of all storage vessels. Valves on discharge lines shall be
located adjacent to the storage tank and within the containment structure.
B) Auxiliary facilities, including pumps and controls, within the
containment area shall be located above the highest anticipated liquid level.
Containment areas shall be sloped to a sump area and shall not contain floor
drains.
C) Bag storage should be located near the solution make-up point
to avoid unnecessary transportation and housekeeping problems.
3) Accessories
A) Platforms, stairways, and railings should be provided as
necessary to afford convenient and safe access to all filling connections,
storage tank entries, and measuring devices.
B) Storage tanks shall have reasonable access provided to
facilitate cleaning.
e) Other Requirements
1) Materials All chemical feed equipment and storage facilities
shall be constructed of materials resistant to chemical attack by all chemicals
normally used for phosphorus treatment.
2) Temperature, Humidity and Dust Control
Precautions shall be taken to prevent chemical storage tanks
and feed lines from reaching temperatures likely to result in freezing or
chemical crystallization at the concentrations employed. Enclosure heating or
insulation may be required. Consideration must be given to temperature,
humidity and dust control in all chemical feed room areas.
3) Cleaning
Consideration shall be given to the accessibility of piping.
Piping should be installed with plugged wyes, tees or crosses at changes in
direction to facilitate cleaning.
4) Drains and Drawoff
Above-bottom drawoff from chemical storage or feed tanks
shall be provided to avoid withdrawal of settled solids into the feed system.
A bottom drain shall also be installed for periodic removal of accumulated
settled solids.
f) Hazardous Chemical Handling
The requirements of Section 370.147(b), Hazardous Chemical
Handling, shall be met.
g) Sludge Handling
1) General
Consideration shall be given to the type and additional
capacity of the sludge handling facilities needed when chemicals are added.
2) Dewatering
Design of dewatering systems should be based, where possible,
on an analysis of the characteristics of the sludge to be handled.
Consideration should be given to the ease of operation, effect of recycle
streams generated, production rate, moisture content, dewaterability, final
disposal, and operating cost.