35 Ill. Adm. Code 370.340
Sewers in Relation to Streams
Section 370
Section 370.340 Sewers in
Relation to Streams
a) Location of Sewers on Streams
1) Cover Depth
A) The top of all sewers entering or crossing streams shall be at
a sufficient depth below the natural bottom of the stream bed to protect the
sewer line. In general the following cover requirements must be met:
i) One foot of cover is required where the sewer is located in
rock.
ii) Three feet of cover is required in other material. In major
streams, more than three feet of cover may be required.
iii) In paved stream channels, the top of the sewer line should be
placed below the bottom of the channel pavement.
B) Less cover will be approved only if the proposed sewer crossing
will not interfere with the future improvements to the stream channel. Reasons
for requesting less cover should be given in the project proposal.
2) Horizontal Location
Sewers located along streams shall be located outside of the
stream bed and sufficiently removed therefrom to provide for future possible
stream widening and to prevent pollution by siltation during construction.
3) Structures
The sewer outfalls, headwalls, manholes, gate boxes, or other
structures shall be located so they do not interfere with the free discharge of
flood flows of the stream.
4) Alignment
Sewers crossing streams should be designed to cross the
stream as nearly perpendicular to the stream flow as possible and shall be
designed without change in grade. Sewer systems shall be designed to minimize
the number of stream crossings.
b) Construction
1) Materials and Backfill
A) Sewers entering or crossing streams shall be constructed of
cast or ductile iron pipe with mechanical joints and shall be capable of
absorbing pipe movement and joint-deflection while remaining intact and
watertight.
B) The backfill used in the trench shall be coarse aggregate,
gravel, or other materials which will not cause siltation, pipe damage during
placement or chemical corrosion in place.
2) Siltation and Erosion
Construction methods that will minimize siltation and erosion
shall be employed. The design engineer shall include in the project
specifications the methods to be employed in the construction of sewers in or
near streams to provide adequate control of siltation and erosion.
Specifications shall require that cleanup, grading, seeding, and planting or
restoration of all work areas shall begin immediately. Exposed areas shall not
remain unprotected for more than seven days.
c) Aerial Crossings
1) Structural Support
Support shall be provided for all joints in pipes utilized
for aerial crossings. The supports shall be designed to prevent frost heave,
overturning and settlement.
2) Freeze and Expansion Protection
Protection against freezing shall be provided. This may be
accomplished through the use of insulation and increased slope. Expansion
jointing shall be provided between the aerial and buried sections of the sewer
line.
3) Flood Clearance
For aerial stream crossings, the impact of flood waters and
debris shall be considered. The bottom of the pipe should be placed no lower
than the elevation of the 50 year flood.
d) Inverted Siphons
Inverted siphons shall have not less than 2 barrels, with a
minimum pipe size of 6 inches and shall be provided with necessary
appurtenances for convenient flushing and maintenance. Long radius fittings
should be used. The inlet and outlet structures shall have adequate clearances
for rodding; and in general, sufficient head shall be provided and pipe sizes
selected to secure velocities of at least 3.0 feet per second for design
average flows. The inlet and outlet structures shall be designed so that the
design average flow is diverted to 1 barrel, and so that either barrel may be
cut out of service for cleaning.