35 Ill. Adm. Code 370.470
Force Mains
Section 370
Section 370.470 Force Mains
a) Velocity and Diameter
At design pumping rates, a cleansing velocity of at least 2
feet per second should be maintained. Lower velocities may be permitted for
very small installations. The minimum force main diameter for raw sewage shall
be 4 inches except for grinder pump lift stations as allowed under Section
370.410(c)(3).
b) Air and Vacuum Relief Valve
An air relief valve shall be placed at high points in the
force main to prevent air locking. Vacuum relief valves may be necessary to
relieve negative pressure on force mains. Force main configuration and head
conditions shall be evaluated as to the need for and placement of vacuum relief
valves.
c) Termination
Force mains should enter the gravity sewer system at a point
not more than 2 feet above the flow line of the receiving manhole.
d) Design Pressure
The force mains and fittings, including reaction blocking,
shall be designed to withstand normal pressure and pressure surges (water
hammer). The need for surge protection chambers shall be evaluated.
e) Special Construction
Force main construction near streams or water works
structures and at water main crossings shall meet applicable provisions of
Sections 370.125 and 370.126.
f) Design Friction Losses
1) Friction losses through force mains shall be based on the
Hazen and Williams formula or other acceptable methods. When the Hazen and
Williams formula is used, the value for "C" shall be 100 for unlined
iron or steel pipe for design. For other smooth pipe materials such as
polyvinyl chloride, polyethylene or lined ductile iron, a higher "C"
value not to exceed 120 may be allowed for design.
2) When initially installed, force mains will have a
significantly higher "C" factor. The effect of the higher
"C" factor should be considered in calculating maximum power
requirements and duty cycle time to prevent damage to the motor.
g) Identification
Where force mains are constructed of material which might
cause the force main to be confused with potable water mains, the force main
shall be appropriately identified.
h) Flexible Pipe Force Main Embedment
Embedment bedding (haunching and initial backfill as depicted
in ASTM D2321-89, Figure (1)) shall be in accordance with Section 20-2.21 A and
20.2.21 B of Standard Specifications for Water and Sewer Main Construction in
Illinois, 5th ed. (1996)(no later editions or amendments).
i) Leakage Testing
Leakage testing shall be specified, including testing methods
and leakage limits.