35 Ill. Adm. Code 370.720
Sludge and Scum Removal
Section 370
Section 370.720 Sludge and
Scum Removal
a) Scum Removal
Full surface mechanical scum collection and removal
facilities, including baffling, shall be provided for all settling tanks,
except for Imhoff tanks. The unusual characteristics of scum which may
adversely affect pumping, piping, sludge handling and disposal, should be
recognized in design. Provisions may be made for the discharge of scum with
the sludge; however, other special provisions for disposal may be necessary.
Refer to Section 370.710(g).
b) Sludge Removal
Mechanical sludge collection and withdrawal facilities shall
be designed to assure an effective and controlled rate of removal of the
sludge. Suction withdrawal is encouraged.
1) Sludge Hopper
The minimum slope of the side walls shall be 1.7 vertical to
1 horizontal. Hopper wall surfaces should be made smooth with rounded corners
to aid in sludge removal. Hopper bottoms shall have a maximum dimension of 2
feet. Extra depth sludge hoppers for sludge thickening are not acceptable.
2) Cross-Collectors
Cross-collectors serving one or more settling tanks may be
useful in place of multiple sludge hoppers.
3) Sludge Removal Piping
Each hopper shall have an individually valved sludge
withdrawal line at least 6 inches in diameter. The static head available for
withdrawal of sludge shall be 30 inches or greater, as necessary to maintain a
3 feet per second velocity in the withdrawal pipe. Clearance between the end
of the withdrawal line and the hopper walls shall be sufficient to prevent
"bridging" of the sludge. Adequate provisions shall be made for
rodding or back-flushing individual pipe runs. Piping shall also be provided
to return waste sludge from secondary and tertiary processes to primary
clarifiers where they are used. Refer to Section 370.820.
4) Sludge Removal Control
Sludge wells equipped with telescoping valves or swing pipes
are recommended for primary sludge and fixed film sludges where periodic
withdrawal is proposed. Air lift type of sludge removal will not be approved
for removal of primary sludges.