35 Ill. Adm. Code 370.915
Rotating Biological Contactors
Section 370
Section 370.915 Rotating
Biological Contactors
a) General
Wastewater treatment facilities that propose to use rotating
biological contactors (RBCs) shall submit to the Agency for review field
experience and operational data that demonstrates that observed problems with
the process have been solved at similar full scale installations. The Agency
will review the claimed field experience against known field conditions and the
operational history of observed problems at similar facilities.
b) Mechanical Reliability and Structural Integrity
1) The mechanical and structural reliability of the shafts and
media subjected to cyclic stress reversals must be demonstrated relative to the
design life of the plant and the known weight of the machines based on field
experience.
2) The design must show that film thickness will be effectively
controlled throughout all parts of the media pack to prevent excessive film
weight and water pickup weight due to plugging restrictions. The equipment
design must include load cells to warn of the need for film thickness control
and to demonstrate the effectiveness of the proposed film thickness control
practices.
c) Process Reliability
1) Process reliability must be demonstrated, including proven
operational control procedures relative to design organic loadings for the unit
media area or volume, which satisfactorily insure that the applicable effluent
standards are met. The process design shall also include proven operational
control procedures that will prevent process functional deficiencies and media
plugging that cause the weight to exceed shaft and media structural
capabilities during the design life of the plant.
2) The design must show that adequate void clearance (as
distinguished from void ratio) is provided to insure that the biological film,
including any grease and fats that may accumulate, will not interefere with the
flow of liquid and air in the media pack. The Agency will compare the RBC
designs under review to past experience with designs used for plastic trickling
filter media to accomplish adequate void clearance.
3) The design shall provide for maintaining a minimum of 2.0 mg/l
dissolved oxygen in the basin liquor. The effectiveness of the proposed method
for maintaining adequate dissolved oxygen will be evaluated based on field
experience at similar full scale installations.
4) If pilot testing is proposed, the size of the RBC pilot plant
unit and the scope and duration of the testing program on the specific waste
that will be treated must be thoroughly documented. The proposed pilot testing
program should be submitted to the Agency for comment prior to the initiation
of testing. The RBC pilot units must be of prototype scale. Because of
differential seasonal weight and plugging field problems, the test period must
cover the four seasons, to allow the Agency to evaluate the proposed design
against the experience of existing full scale plants.
5) The process design must include provisions for meeting
applicable effluent limits with some units out of service for unit repair,
biofilm thickness control, out-of-balance correction and other operational
problems. Added units for standby credit will be required to insure compliance
with effluent limitations and to prevent mechanical or structural failures
during periods of unit outage for maintenance, repair, or process control
purposes.