35 Ill. Adm. Code 371.263
Chapter III - Description, Operation and Control of Pumping Stations and Collection Systems
Section 371
Section 371.263 Chapter III −
Description, Operation and Control of Pumping Stations and Collection Systems
a) Include a layout illustration that clearly shows the
following:
1) The layout of the collection system;
2) The locations of the collection system appurtenances with all
manholes numbered;
3) The locations of all pumping stations, force mains, and air
relief valves;
4) The locations of standby generators or pumping equipment;
5) The locations of any bypasses or alternate flow paths.
b) Trace the wastewater flow through the pumping stations and
collection system and describe the operation of each unit or appurtenance in
detail. The following information for each unit must be provided:
1) Purpose
2) Equipment
A) Manufacturer
B) Model number
C) Number of units
D) Description of equipment
3) Unit illustration
−
individual unit drawings,
diagrams, etc., which clearly illustrate the following:
A) Piping layout
B) Numbered valves, check valves, flap gates, etc.
C) Pumping equipment
D) Any bypasses and alternate flow paths
4) Relationship to other units
5) Operation
A) Initial start-up
B) Normal operation
C) Alternate modes of operation
D) Bypassing, shut-down, and drainage
E) Emergency operation
6) Controls
A) Flow controls
B) Electrical controls
C) Laboratory and other process control techniques, if applicable
7) Operational problems
A) Unit problems
B) Mechanical problems
C) Troubleshooting guides
8) Routine maintenance considerations
A) Schedule for inspection, cleaning, lubrication, adjustment,
calibration, painting, and any other routine maintenance activities.
Maintenance tasks must be scheduled on a daily, weekly, monthly, quarterly,
semi-annual, and annual basis. If appropriate, use "hours of
operation" to schedule preventive maintenance for equipment.
B) List the materials, including paints and lubricants, needed to
maintain each unit.
c) Provide illustrations of manholes, drop manholes, and house
connections typical for this project.
d) Include a valve index with the following information:
1) Number all valves as shown in the unit illustrations required
in subparagraph (b)(3) above.
2) Identify the size and type of all valves.
3) Indicate the normal operational setting, i.e., open, closed,
etc. for each valve listed.
e) Discuss the importance of numbering and tagging the valves in
accordance with the valve index.
f) List the references in the O&M library that supplement
discussions of:
1) Operation
2) Maintenance
3) Operational problems and troubleshooting
4) Laboratory and other process control techniques