35 Ill. Adm. Code 380.1005
Contract Provisions
Section 380
Section 380.1005 Contract
Provisions
When the owner of a wastewater
treatment or pretreatment works satisfies the Chief Wastewater Operator
requirements of Subpart B by contracting the services of a certified
operator, the contract between the owner and the contract operator must
delegate responsibility and authority for the operation of the facility to the
contract operator. The contract must include the following:
a) The parties involved, including names, addresses and phone
numbers of each and the Operator ID of the contract operator;
b) The specific starting and expiration dates of the contract;
c) The minimum number of visits to be made to the wastewater
treatment works by the contract operator each week, or month, whichever is
applicable;
d) A statement that the contract operator is responsible for the
proper operation of the wastewater treatment works including meeting all state
operating permit and NPDES permit requirements;
e) The duties and responsibilities of each party involved
including, at a minimum, the party responsible for:
1) Sample collection pursuant to the NPDES Permit;
2) Preparation, signature, and submittal of Discharge Monitoring
Reports, sludge analysis reports, and notices of noncompliance;
3) Laboratory analysis;
4) Maintaining lift stations;
5) Maintaining spare parts inventory;
6) Maintaining required operating records and reports;
7) Providing labor and materials for correcting any maintenance
and operational problems;
8) Maintaining, and if necessary, implementing an emergency
operating plan;
9) Performing preventive maintenance on equipment as recommended
by the manufacturer; and
10) Performing routine operational control testing as recommended
by the Agency.
f) The signature of each party of the contract.