35 Ill. Adm. Code 391.203
Permit Requirements
Section 391
Section 391.203 Permit
Requirements
a) A sludge generator is responsible for complying with the
sludge management plan set forth in its permit. If sludge is transferred to
any person who requires off-site interim storage, or is applied by a person
other than the generator, the user shall also be responsible for its
utilization in full compliance with the generator's sludge management plan and
its permit. Sludge generators shall be responsible for informing all the
sludge users of the sludge quality and shall recommend application rates for the
user's specific needs.
b) In order to minimize odor potential and reduce pathogen
organism content, wastewater sludges must be digested or stablized prior to
application. During situations when NPDES effluent violations may exist and no
landfill is accessible, land application of partially stabilized sludge shall
be allowed when approved by Agency permit.
c) Sludge generators with sludge utilization permits from the
Agency may sell or give away quantities of liquid or dried sludge in excess of
one equivalent semi-trailer truck load, (approximately 25 cubic yards) per year
to a sludge user provided the sludge user completes and signs an information
sheet. As a minimum, the information sheet must contain the items outlined in
APPENDIX G, H or I of this Part. These signed sheets are to be retained by the
sludge generator (with a copy to the user) for inspection throughout the
duration of their permit and for two years following the expiration date of the
permit. Sludge records shall include:
1) Date of sludge shipment or application;
2) Weather conditions when delivered;
3) Location of sludge destination;
4) Amount of sludge applied or delivered;
5) Analysis of sludge pursuant to generator's permit;
d) Sludge generators with sludge utilization permits from the
Agency may sell or give away quantities of liquid or dried sludge less than or
equal to one semi-trailer truck load (approximately 25 cubic yards) per year to
a sludge user without keeping records of such users as stated in (c) above. The
sludge generator shall provide an information sheet as described in APPENDIX G,
H or I to each sludge user.
e) Sludge generators and users that receive permits must monitor
their sludge quality, provide soil and groundwater analyses and (when required)
report to the Agency as specified in Sections 391.430, 391.440 and 391.501 or
in the permit issued by the Agency. Sludge users that receive permits shall
submit monthly reports to the Agency which shall include the following minimal
information:
1) Permit number and name of sludge generator;
2) Date of sludge transfer;
3) Volume of sludge transferred;
4) Location of application sites;
5) Most recent chemical analysis of the sludge applied;
6) Application rate and metal loading rate;
7) Method of application.