35 Ill. Adm. Code 506.106
Alternatives, Modifications, and Waivers
Section 506
Section 506.106
Alternatives, Modifications, and Waivers
a) All requests for alternatives, modifications, and waivers to
this Part, where allowed by Sections 13(e) and 15(a) of the Act [510 ILCS
77/13(e), 15(a)] or this Part must be made in writing to the Department.
Construction must not begin or continue until the request for alternative,
modification, or waiver is granted.
b) Each request for an alternative, modification, or waiver must
contain a certification from a Licensed Professional Engineer or Licensed
Professional Geologist, as relevant, that the grant of the modification is at
least as protective of the groundwater, the surface water, and the structural
integrity of the livestock waste management facility as the stated requirements
or that the alternative or waiver is at least as protective as the stated
requirements.
c) The Department must notify the applicant in writing of its
determination within 30 days after receipt of the request for an alternative,
modification, or waiver. To grant the requested alternative, modification, or
waiver, the Department must determine that the modification is at least as
protective of the groundwater, the surface water, and the structural integrity
of the livestock waste management facility as the stated requirements or that
the alternative or waiver is at least as protective as the stated requirements.