35 Ill. Adm. Code 506.208
Construction in a Flood Fringe Area
Section 506
Section 506.208 Construction
in a Flood Fringe Area
A new earthen livestock waste
lagoon may be constructed within the portion of a 100-year floodplain that is
within the flood fringe and outside the floodway
if
the facility is
designed and constructed so that livestock waste is not readily removed during
flooding and meets the requirements set forth in the Rivers, Lakes, and Streams
Act
[615 ILCS 5]
, Section 5-40001 of the Counties Code
[55 ILCS
5/5-40001]
, and executive order number 4 (1979).
[510 ILCS
77/15(a-5)(1)] The following criteria must be incorporated into the design of a
lagoon proposed for construction in the flood fringe of a 100-year floodplain:
a) The lagoon berms must be designed and constructed to withstand
the hydrostatic pressures from flood waters that may be exerted on the berms
during a flood event.
b) The elevation of the lowest point on the berm top must be at
the summation of the elevation of the 100-year flood plus a freeboard. The
freeboard height must be a minimum of two feet.
c) For lagoons with unequal length and width dimensions, the
lagoon must be oriented with the longest dimension parallel to the expected
direction of floodwater flow.
d) Any monitoring wells installed under Section 506.206 must be
mounted flush with the surrounding soil surface or otherwise physically
protected from flood waters.
e) The owner or operator of the livestock waste handling facility
may, upon written request and with written approval from the Department, modify
or exceed these standards to meet site specific objectives. The owner or operator
must demonstrate that such modification will be at least as protective of the
groundwater, the surface water, and the structural integrity of the livestock
waste handling facility as the requirements of this Part.