35 Ill. Adm. Code 6020.602.200
Construction Permit Requirement
TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE F: PUBLIC WATER SUPPLIES
CHAPTER I: POLLUTION CONTROL BOARD
PART 602 PERMITS
SECTION 602.200 CONSTRUCTION PERMIT REQUIREMENT
Section 602.200 Construction
Permit Requirement
a) A person must not cause or
allow the construction of any new community water supply installation, or cause
or allow the change of or addition to any existing community water supply,
without a construction permit issued by the Agency.
b) Construction permits must be
obtained by the owner or official custodian of a community water supply:
1) prior to beginning
construction of any proposed community water supply;
2) prior to all
alterations, changes or additions to an existing community water supply that
may affect the sanitary quality, mineral quality or adequacy of the community
water supply;
3) prior to adding new
chemicals to the treatment process or changing the points of chemical
application; and
4) prior to rehabilitating
a water main using a liner.
c) Except as required by
subsection (b), a construction permit is not needed for normal work items such
as:
1) installation of customer
service connections to distribution system water mains;
2) installation or replacement of
hydrants and valves in the distribution system;
3) repair of water mains,
including replacement of existing water mains with mains of equivalent size
pipe in the same location;
4) routine maintenance of
equipment, such as painting, reconditioning or servicing;
5) replacement of chemical
feeders, pumps, controls, filter media, softener resins, pipes and
appurtenances that have the same rated capacity and specification as existing
facilities previously permitted by the Agency; or
6) installation
or replacement of meters.
d) All work performed on a
community water supply must be in accordance with accepted engineering
practices.