35 Ill. Adm. Code 602.116
Requirement for As-Built Plans
Section 602
Section 602.116 Requirement
for As-Built Plans
If any portion of a community
water supply has been constructed without a construction permit as required by
Section 602.101, or an emergency permit issued under Section 602.104, the
community water supply must submit to the Agency as-built plans and
specifications and a construction permit application. As-built plans and
specifications must be prepared by a qualified person as described in Section 602.105(a)(4).
All plans and specifications submitted to the Agency under this Section must be
clearly marked "as-built" or "record drawings". Any
deficiencies requiring correction, as determined by the Agency, must be
corrected within a time limit set by the Agency. Submission of as-built plans
and the correction of any deficiencies does not relieve the owner or official
custodian from any liability for construction without a permit.