35 Ill. Adm. Code 662.430
Loan Eligible Costs
Section 662.430 Loan Eligible Costs
The loan recipient shall be paid, upon request, in
accordance with Section 662.440, for all costs within the scope of the approved
project, not to exceed the total amount of the loan, and that are determined to
be eligible in accordance with the following criteria:
a) Eligible
project costs include all reasonable and necessary costs directly attributable
to the project's planning, design, or construction that are not otherwise
excluded by this Part. Categories of necessary costs include, but are not limited
to, the following:
1) The
direct purchase of materials, equipment, and personal services not under the
approved construction contract necessary for the completion of a loan funded
project;
2) Professional
and consultant services contracts necessary for planning, design, bidding, and
construction of a loan funded project, except as elsewhere limited by this
Part;
3) Costs
under approved construction contracts;
4) Costs
for premiums for required flood insurance during the project construction
period;
5) Costs
for the acquisition of land only if needed for the purposes of locating
eligible project components. The land must be acquired from a willing seller;
6) Costs
for restructuring loan recipients that are in significant noncompliance with
any national primary drinking water regulation or variance or that lack the
technical, financial, and managerial capability to ensure compliance with the
requirements of the SDWA, unless the loan recipient is ineligible under Section
662.130(b)(2) or (b)(3); and
7) Costs
under a construction contract executed prior to the award of the loan agreement
only when the following conditions apply:
A) The
loan applicant has received written approval from the Agency prior to the award
of the construction contract; and
B) The
project meets the definition of a compliance project in Section 662.110 or the
project costs are associated with drilling and testing wells for source water
quantity and quality.
b) Ineligible project costs
include, but are not limited to, the following:
1) Laboratory
fees for routine compliance monitoring;
2) Operation
and maintenance expenses;
3) Costs
outside the scope of the approved Project Plan;
4) Construction
of any facilities that do not fall within the definition of a community water
supply facility as contained in the SDWA or do not qualify in meeting the
federal green project reserve requirements;
5) Costs
of projects whose main purpose is fire protection or servicing future growth.