35 Ill. Adm. Code 615.443
Required Closure of Units Located Within Maximum Setback Zones
Section 615
Section 615.443 Required
Closure of Units Located Within Maximum Setback Zones
Starting two years after the
effective date of the ordinance or regulation that establishes a maximum
setback zone, a person must not cause or allow the operation within the maximum
setback zone of any surface impoundment unit at which special waste is stored,
treated or disposed of. Closure must be completed within three years after the
effective date of the ordinance or regulation that establishes the maximum
setback zone.