35 Ill. Adm. Code 704.129
Transitioning from a Class II Injection Well to a Class VI Injection Well
Section 704.129 Transitioning from a Class II Injection
Well to a Class VI Injection Well
a) The
owner or operator of a Class II injection well that is injecting carbon dioxide
into an oil and gas reservoir for the primary purpose of long-term storage must
apply for and obtain a Class VI injection well geologic sequestration permit
when there is an increased risk to a USDW compared to usual Class II injection
well operations. In determining if there is an increased risk to a USDW, the
owner or operator must consider the factors specified for Agency consideration
in subsection (b).
b) The
Agency must determine when there is an increased risk to a USDW from injecting
carbon dioxide into an oil and gas reservoir for the primary purpose of
long-term storage compared to usual Class II injection well operations and that
a Class VI injection well permit is required. In order to make this
determination, the Agency must consider the following factors:
1) Any
increase in reservoir pressure within the injection zones;
2) Any
increase in carbon dioxide injection rates;
3) Any
decrease in reservoir production rates;
4) The
distance between the injection zones and USDWs;
5) The
suitability of the Class II injection well area of review delineation;
6) The
quality of abandoned well plugs within the area of review;
7) The
owner's or operator's plan for recovery of carbon dioxide after the cessation
of injection;
8) The
source and properties of injected carbon dioxide; and
9) Any
additional site-specific factors that the Agency determines are necessary to
determine whether the injection poses greater risk than usual Class II
operations.
BOARD NOTE: Derived from 40 CFR 144.19 (2017).