35 Ill. Adm. Code 704.185
Operation Requirements
Section 704
Section 704.185 Operation
Requirements
The permit must establish any
maximum injection volumes and pressures necessary to assure that fractures are
not initiated in the confining zone, that injected fluids do not migrate into
any USDW, that formation fluids are not displaced into any USDW, and to assure
compliance with the 35 Ill. Adm. Code 730 operating requirements.
BOARD NOTE: Derived from 40 CFR
144.52(a)(3) (2005).