35 Ill. Adm. Code 720.133
Procedures for Determinations
Section 720
Section 720.133 Procedures
for Determinations
The Board will use the
procedures of Subpart D of 35 Ill. Adm. Code 104 for determining whether a
material is a solid waste, for determining that a hazardous secondary material
is managed at a verified facility, for determining whether a particular
enclosed flame combustion device is a boiler, or for evaluating an application
for a non-waste determination.
a) The
application must address the relevant criteria contained in Section 720.131,
720.132, or 720.134, as applicable.
b) This
subsection (b) corresponds with 40 CFR 260.33(b), which pertains to the USEPA
procedure for review of petitions. This statement maintains structural
consistency with USEPA rules.
c) Changed
Circumstances.
1) If a
change in circumstances that affects how a hazardous secondary material meets
the relevant criteria contained in Section 720.131, 720.132, or 720.134 upon
which a solid waste, verified facility, or non-waste determination has been
based, the applicant must submit a description of the change in circumstances
to the Board as a petition for adjusted standard that requests modifying the
previously granted solid waste, boiler, or non-waste determination under which
the petitioner operates or, in the alternative, a Board order that no such
modification is necessary.
2) The
Board will do the following:
A) determine,
based on the record, whether the hazardous secondary material continues to meet
the relevant criteria that justify exclusion from definition as solid waste;
and
B) issue
an appropriate order granting or denying the petition.
d) A
solid waste, verified facility, boiler, or non-waste determination is effective
for a fixed term not to exceed 10 years, except as provided in this subsection
(d). No later than six months prior to the end of this term, facilities must
re-apply for a solid waste, verified facility, boiler, or non-waste
determination. If a facility owner or operator re-applies for a solid waste, verified
facility, boiler, or non-waste determination no later than six months prior to
expiration of a solid waste, verified facility, boiler, or non-waste determination,
the facility may continue to operate under an expired solid waste, boiler, or
non-waste determination until receiving a decision on the re-application from
the Board.
e) A
facility that receives a solid waste, boiler, or non-waste determination must
provide notification, as required by Section 720.142.