35 Ill. Adm. Code 722.361
Content of Contingency Plan
Section
722.361
Content of
Contingency Plan
a) The
contingency plan
must
describe the
actions required of facility personnel to comply with Sections
722.360 and 722.365 in response to fires, explosions, or any unplanned sudden
or non-sudden release of hazardous waste or hazardous waste constituents to
air, soil, or surface water at the facility.
b) If
the generator has already prepared a Spill Prevention, Control, and
Countermeasures (SPCC) Plan in accordance with 40 CFR 112 or some other
emergency or contingency plan, the generator needs only amend that plan to
incorporate hazardous waste management provisions that are sufficient to comply
with the standards of this Part. The generator may develop one contingency
plan that meets all regulatory standards.
BOARD NOTE: USEPA recommends that
the plan be based on the National Response Team's Integrated Contingency Plan
Guidance ("One Plan"). The National Response Team published the
Guidance at 61 Fed. Reg. 28642 (June 5, 1996).
c) The
plan must describe arrangements agreed to with the local police department,
fire department, other emergency response teams, emergency response
contractors, equipment suppliers, local hospitals, or the Local Emergency
Planning Committee, if applicable, pursuant to Section 722.356.
d) The
plan must list names and emergency telephone numbers of all persons qualified
to act as emergency coordinator (see Section 722.364), and the generator must
keep this list up to date. Where more than one person is listed, one must be
named as primary emergency coordinator and others must be listed in the order
in which they will assume responsibility as alternates.
If
the generator facility
has an emergency coordinator continuously on duty
because it operates 24 hours per day, every day of the year, the plan may list
the staffed position (e.g., operations manager, shift coordinator, shift
operations supervisor), as well as an emergency telephone number that will be
answered at all times.
e) The
plan must include a list of all emergency equipment at the facility (such as
fire extinguishing systems, spill control equipment, communications and alarm
systems (internal and external), and decontamination equipment), where this
equipment is required. The generator must keep this list up to date. In
addition, the plan must include the location and a physical description of each
item on the list, and a brief outline of its capabilities.
f) The
plan must include an evacuation plan for generator personnel where there is a
possibility that evacuation could be necessary. This plan must describe
signals to be used to begin evacuation, evacuation routes, and alternate
evacuation routes (in cases where the primary routes could be blocked by
releases of hazardous waste or fires).