35 Ill. Adm. Code 724.119
Construction Quality Assurance Program
Section 724
Section 724.119Â Construction
Quality Assurance Program
a)Â Â Â Â Â Â Â Â Construction
Quality Assurance (CQA) Program
1)Â Â Â Â Â Â Â Â A CQA program is required for all surface impoundment, waste
pile and landfill units that are required to comply with Sections 724.321(c)
and (d), 724.351(c) and (d), and 724.401(c) and (d). The program must ensure
that the constructed unit meets or exceeds all design criteria and
specifications in the permit. The program must be developed and implemented
under the direction of a CQA officer who is a registered professional engineer.
2)Â Â Â Â Â Â Â Â The CQA program must address the following physical
components, where applicable:
A)Â Â Â Â Â Â Â Foundations;
B)Â Â Â Â Â Â Â Dikes;
C)Â Â Â Â Â Â Â Low-permeability
soil liners;
D)Â Â Â Â Â Â Â Geomembranes
(flexible membrane liners);
E)Â Â Â Â Â Â Â Leachate collection and removal systems and leak detection
systems; and
F)Â Â Â Â Â Â Â Â Final
cover systems.
b)        Written CQA Plan. The owner or operator of units subject to
the CQA program under subsection (a) must develop and implement a written CQA
plan. The plan must identify steps that will be used to monitor and document
the quality of materials and the condition and manner of their installation.
The CQA plan must include the following:
1)Â Â Â Â Â Â Â Â Identification of applicable units, and a description of how
they will be constructed.
2)Â Â Â Â Â Â Â Â Identification of key personnel in the development and
implementation of the CQA plan, and CQA officer qualifications.
3)Â Â Â Â Â Â Â Â A description of inspection and sampling activities for all
unit components identified in subsection (a)(2), including observations and
tests that will be used before, during and after construction to ensure that
the construction materials and the installed unit components meet the design
specifications. The description must cover: Sampling size and locations;
frequency of testing; data evaluation procedures; acceptance and rejection
criteria for construction materials; plans for implementing corrective
measures; and data or other information to be recorded and retained in the
operating record under Section 724.173.
c)Â Â Â Â Â Â Â Â Contents
of Program
1)Â Â Â Â Â Â Â Â The CQA program must include observations, inspections, tests
and measurements sufficient to ensure the following:
A)       Structural stability and integrity of all components of the
unit identified in subsection (a)(2);
B)Â Â Â Â Â Â Â Proper construction of all components of the liners, leachate
collection and removal system, leak detection system, and final cover system,
according to permit specifications and good engineering practices and proper
installation of all components (e.g., pipes) according to design
specifications;
C)Â Â Â Â Â Â Â Conformity of all materials used with design and other material
specifications under Sections 724.321, 724.351, and 724.401.
2)Â Â Â Â Â Â Â Â The CQA program must include test fills for compacted soil
liners, using the same compaction methods as in the full scale unit, to ensure
that the liners are constructed to meet the hydraulic conductivity requirements
of Sections 724.321(c)(1)(A)(ii), 724.351(c)(1)(A)(ii), or 724.401(c)(1)(A)(ii)
in the field. Compliance with the hydraulic conductivity requirements must be
verified by using in-situ testing on the constructed test fill. The Agency must
accept an alternative demonstration, in lieu of a test fill, where data are
sufficient to show that a constructed soil liner will meet the hydraulic
conductivity requirements of Sections 724.321(c)(1)(A)(ii),
724.351(c)(1)(A)(ii), or 724.401(c)(1)(A)(ii) in the field.
d)        Certification. Waste must not be received in a unit subject
to Section 724.119 until the owner or operator has submitted to the Agency by
certified mail or hand delivery a certification signed by the CQA officer that
the approved CQA plan has been successfully carried out and that the unit meets
the requirements of Sections 724.321(c) or (d), 724.351(c) or (d), or
724.401(c) or (d); and the procedure in 35 Ill. Adm. Code 703.247(b) has been
completed. Documentation supporting the CQA officer's certification must be
furnished to the Agency upon request.