35 Ill. Adm. Code 724.152
Content of Contingency Plan
Section 724.152 Content of
Contingency Plan
a) The contingency plan must describe the actions facility
personnel must take to comply with Sections 724.151 and 724.156 in response to
fires, explosions, or any unplanned sudden or non-sudden release of hazardous
waste or hazardous waste constituents to air, soil, or surface water at the
facility.
b) If the owner or operator has already prepared a Spill
Prevention Control and Countermeasures (SPCC) Plan in accordance with federal
40 CFR 112, or some other emergency or contingency plan, the owner or operator
need only amend that plan to incorporate hazardous waste management provisions
that are sufficient to comply with the requirements of this Part. The owner or
operator may develop one contingency plan that meets all regulatory
requirements. USEPA has recommended that the plan be based on the National
Response Team's Integrated Contingency Plan Guidance (One Plan). When
modifications are made to non-RCRA provisions in an integrated contingency
plan, the changes do not trigger the need for a RCRA permit modification.
BOARD NOTE:
The federal One Plan guidance appeared in the Federal Register at 61 Fed. Reg.
28642 (June 5, 1996), and was corrected at 61 Fed. Reg. 31103 (June 19, 1996).
USEPA, Office of Resource Conservation and Recovery, Chemical Emergency
Preparedness and Prevention Office, has made these documents available on-line
for examination and download at www.epa.gov/emergencies (search for "one
plan" or "integrated contingency plan" documents).
c) The plan must describe arrangements agreed to by local police
departments, fire departments, hospitals, contractors, and state and local
emergency response teams to coordinate emergency services pursuant to Section
724.137.
d) The plan must list names, addresses, and phone numbers (office
and home) of all persons qualified to act as emergency coordinator (see Section
724.155), and this list must be kept up to date. Where more than one person is
listed, one must be named as primary emergency coordinator and others must be
listed in the order in which they will assume responsibility as alternates. For
new facilities, this information must be supplied to the Agency at the time of
certification, rather than at the time of permit application.
e) The plan must include a list of all emergency equipment at the
facility (such as fire extinguishing systems, spill control equipment,
communications and alarm systems (internal and external), and decontamination
equipment), where this equipment is required. This list must be kept up to
date. In addition, the plan must include the location and a physical
description of each item on the list and a brief outline of its capabilities.
f) The plan must include an evacuation plan for facility
personnel where there is a possibility that evacuation could be necessary. This
plan must describe signals to be used to begin evacuation, evacuation routes
and alternative evacuation routes (in cases where the primary routes could be
blocked by releases of hazardous waste or fires).