35 Ill. Adm. Code 724.293
Containment and Detection of Releases
Section 724
Section 724.293Â Containment
and Detection of Releases
a)Â Â Â Â Â Â Â Â In order to prevent the release of hazardous waste or
hazardous constituents to the environment, secondary containment that meets the
requirements of this Section must be provided (except as provided in subsections
(f) and (g)).
1)Â Â Â Â Â Â Â Â For a new or existing tank system or component, prior to their
being put into service.
2)Â Â Â Â Â Â Â Â For a tank system that stores or treats materials that become
hazardous wastes within two years after the hazardous waste listing, or when
the tank system has reached 15 years of age, whichever comes later.
b)Â Â Â Â Â Â Â Â Secondary containment systems must fulfill the following:
1)Â Â Â Â Â Â Â Â It must be designed, installed, and operated to prevent any
migration of wastes or accumulated liquid out of the system to the soil,
groundwater, or surface water at any time during the use of the tank system;
and
2)Â Â Â Â Â Â Â Â It must be capable of detecting and collecting releases and
accumulated liquids until the collected material is removed.
c)Â Â Â Â Â Â Â Â To meet the requirements of subsection (b), secondary
containment systems must, at a minimum, fulfill the following:
1)Â Â Â Â Â Â Â Â It must be constructed of or lined with materials that are
compatible with the wastes to be placed in the tank system and must have
sufficient strength and thickness to prevent failure owing to pressure
gradients (including static head and external hydrological forces), physical
contact with the waste to which it is exposed, climatic conditions, and the
stress of daily operation (including stresses from nearby vehicular traffic);
2)Â Â Â Â Â Â Â Â It must be placed on a foundation or base capable of providing
support to the secondary containment system, resistance to pressure gradients
above and below the system, and capable of preventing failure due to
settlement, compression or uplift;
3)Â Â Â Â Â Â Â Â It must be provided with a leak-detection system that is
designed and operated so that it will detect the failure of either the primary
or secondary containment structure or the presence of any release of hazardous
waste or accumulated liquid in the secondary containment system within 24 hours,
or at the earliest practicable time if the owner or operator demonstrates, by
way of permit application, to the Agency that existing detection technologies
or site conditions will not allow detection of a release within 24 hours; and
4)Â Â Â Â Â Â Â Â It must be sloped or otherwise designed or operated to drain
and remove liquids resulting from leaks, spills, or precipitation. Spilled or
leaked waste and accumulated precipitation must be removed from the secondary
containment system within 24 hours, or in as timely a manner as is possible to
prevent harm to human health and the environment, if the owner or operator
demonstrates to the Agency, by way of permit application, that removal of the
released waste or accumulated precipitation cannot be accomplished within 24
hours.
BOARD NOTE:Â If the collected material is a hazardous waste
under 35 Ill. Adm. Code 721, it is subject to management as a hazardous waste
in accordance with all applicable requirements of 35 Ill. Adm. Code 722 through
728. If the collected material is discharged through a point source to waters
of the State, it is subject to the NPDES permit requirement of Section 12(f) of
the Environmental Protection Act and 35 Ill. Adm. Code 309. If discharged to a
Publicly Owned Treatment Work (POTW), it is subject to the requirements of 35
Ill. Adm. Code 307 and 310. If the collected material is released to the
environment, it may be subject to the reporting requirements of 35 Ill. Adm.
Code 750.410 and federal 40 CFR 302.6.
d)Â Â Â Â Â Â Â Â Secondary containment for tanks must include one or more of
the following devices:
1)Â Â Â Â Â Â Â Â A liner (external to the tank);
2)Â Â Â Â Â Â Â Â A vault;
3)Â Â Â Â Â Â Â Â A double-walled tank; or
4)Â Â Â Â Â Â Â Â An equivalent device, as approved by the Board in an adjusted
standards proceeding.
e)Â Â Â Â Â Â Â Â In addition to the requirements of subsections (b), (c), and
(d), secondary containment systems must satisfy the following requirements:
1)Â Â Â Â Â Â Â Â An external liner system must fulfill the following:
A)Â Â Â Â Â Â Â It must be designed or operated to contain 100 percent of the
capacity of the largest tank within its boundary.
B)Â Â Â Â Â Â Â It must be designed or operated to prevent run-on or
infiltration of precipitation into the secondary containment system, unless the
collection system has sufficient excess capacity to contain run-on or
infiltration. Such additional capacity must be sufficient to contain
precipitation from a 25-year, 24-hour rainfall event.
C)Â Â Â Â Â Â Â It must be free of cracks or gaps.
D)Â Â Â Â Â Â Â It must be designed and installed to surround the tank
completely and to cover all surrounding earth likely to come into contact with
the waste if the waste is released from the tanks (i.e., it is capable of
preventing lateral as well as vertical migration of the waste).
2)Â Â Â Â Â Â Â Â A vault system must fulfill the following:
A)Â Â Â Â Â Â Â It must be designed or operated to contain 100 percent of the
capacity of the largest tank within the vault system's boundary;
B)Â Â Â Â Â Â Â It must be designed or operated to prevent run-on or infiltration
of precipitation into the secondary containment system unless the collection
system has sufficient excess capacity to contain run-on or infiltration. Such
additional capacity must be sufficient to contain precipitation from a 25-year,
24-hour rainfall event;
C)Â Â Â Â Â Â Â It must be constructed with chemical-resistant water stops in
place at all joints (if any);
D)Â Â Â Â Â Â Â It must be provided with an impermeable interior coating or
lining that is compatible with the stored waste and that will prevent migration
of waste into the concrete;
E)Â Â Â Â Â Â Â It must be provided with a means to protect against the
formation of and ignition of vapors within the vault, if the waste being stored
or treated fulfills the following:
i)Â Â Â Â Â Â Â Â Â It meets the definition of ignitable waste under 35 Ill. Adm.
Code 721.121; or
ii)Â Â Â Â Â Â Â Â It meets the definition of reactive waste under 35 Ill. Adm.
Code 721.123, and may form an ignitable or explosive vapor; and
F)Â Â Â Â Â Â Â Â It must be provided with an exterior moisture barrier or be
otherwise designed or operated to prevent migration of moisture into the vault
if the vault is subject to hydraulic pressure.
3)Â Â Â Â Â Â Â Â A double-walled tank must fulfill the following:
A)Â Â Â Â Â Â Â It must be designed as an integral structure (i.e., an inner
tank completely enveloped within an outer shell) so that any release from the
inner tank is contained by the outer shell;
B)Â Â Â Â Â Â Â It must be protected, Â if constructed of metal, from both
corrosion of the primary tank interior and of the external surface of the outer
shell; and
C)Â Â Â Â Â Â Â It must be provided with a built-in continuous leak detection
system capable of detecting a release within 24 hours, or at the earliest
practicable time, if the owner or operator demonstrates, by way of permit
application, to the Agency that the existing detection technology or site
conditions would not allow detection of a release within 24 hours.
BOARD NOTE:Â
The provisions outlined in the Steel Tank Institute document (STI)
"Standard for Dual Wall Underground Steel Storage Tanks",
incorporated by reference in 35 Ill. Adm. Code 720.111(a), may be used as a
guideline for aspects of the design of underground steel double-walled tanks.
f)Â Â Â Â Â Â Â Â Ancillary equipment must be provided with secondary
containment (e.g., trench, jacketing, double-walled piping, etc.) that meets
the requirements of subsections (b) and (c), except as follows:
1)Â Â Â Â Â Â Â Â Aboveground piping (exclusive of flanges, joints, valves, and
other connections) that are visually inspected for leaks on a daily basis;
2)Â Â Â Â Â Â Â Â Welded flanges, welded joints, and welded connections that are
visually inspected for leaks on a daily basis;
3)Â Â Â Â Â Â Â Â Sealless or magnetic coupling pumps and sealless valves that
are visually inspected for leaks on a daily basis; and
4)Â Â Â Â Â Â Â Â Pressurized aboveground piping systems with automatic shut-off
devices (e.g., excess flow check valves, flow metering shutdown devices, loss
of pressure actuated shut-off devices, etc.) that are visually inspected for
leaks on a daily basis.
g)Â Â Â Â Â Â Â Â Pursuant to Section 28.1 of the Environmental Protection Act,
and in accordance with 35 Ill. Adm. Code 101 and 104, an adjusted standard will
be granted by the Board regarding alternative design and operating practices
only if the Board finds either that the alternative design and operating
practices, together with location characteristics, will prevent the migration
of any hazardous waste or hazardous constituents into the groundwater or
surface water at least as effectively as secondary containment during the active
life of the tank system, or that in the event of a release that does migrate to
groundwater or surface water, no substantial present or potential hazard will
be posed to human health or the environment. New underground tank systems may
not receive an adjusted standard from the secondary containment requirements of
this Section through a justification in accordance with subsection (g)(2).
1)Â Â Â Â Â Â Â Â When determining whether to grant alternative design and
operating practices based on a demonstration of equivalent protection of
groundwater and surface water, the Board will consider whether the petitioner
has justified an adjusted standard based on the following factors:
A)Â Â Â Â Â Â Â The nature and quantity of the wastes;
B)Â Â Â Â Â Â Â The proposed alternative design and operation;
C)Â Â Â Â Â Â Â The hydrogeologic setting of the facility, including the
thickness of soils present between the tank system and groundwater; and
D)Â Â Â Â Â Â Â All other factors that would influence the quality and mobility
of the hazardous constituents and the potential for them to migrate to
groundwater or surface water.
2)Â Â Â Â Â Â Â Â When determining whether to grant alternative design and
operating practices based on a demonstration of no substantial present or
potential hazard, the Board will consider whether the petitioner has justified
an adjusted standard based on the following factors:
A)Â Â Â Â Â Â Â The potential adverse effects on groundwater, surface water and
land quality taking into account, considering the following:
i)Â Â Â Â Â Â Â Â Â The physical and chemical characteristics of the waste in the
tank system, including its potential for migration;
ii)Â Â Â Â Â Â Â Â The hydrogeological characteristics of the facility and
surrounding land;
iii)Â Â Â Â Â Â Â The potential for health risk caused by human exposure to
waste constituents;
iv)Â Â Â Â Â Â Â The potential for damage to wildlife, crops, vegetation, and
physical structures caused by exposure to waste constituents; and
v)Â Â Â Â Â Â Â Â The persistence and permanence of the potential adverse
effects.
B)Â Â Â Â Â Â Â The potential adverse effects of a release on groundwater
quality, taking into account;
i)Â Â Â Â Â Â Â Â Â The quantity and quality of groundwater and the direction of
groundwater flow;
ii)Â Â Â Â Â Â Â Â The proximity and withdrawal rates of groundwater users;
iii)Â Â Â Â Â Â Â The current and future uses of groundwater in the area; and
iv)Â Â Â Â Â Â Â The existing quality of groundwater, including other sources
of contamination and their cumulative impact on the groundwater quality.
C)Â Â Â Â Â Â Â The potential adverse effects of a release on surface water
quality, taking the following into account:
i)Â Â Â Â Â Â Â Â Â The quantity and quality of groundwater and the direction of
groundwater flow;
ii)Â Â Â Â Â Â Â Â The patterns of rainfall in the region;
iii)Â Â Â Â Â Â Â The proximity of the tank system to surface waters;
iv)Â Â Â Â Â Â Â The current and future uses of surface waters in the area and
water quality standards established for those surface waters; and
v)Â Â Â Â Â Â Â Â The existing quality of surface water, including other sources
of contamination and the cumulative impact on surface water quality.
D)Â Â Â Â Â Â Â The potential adverse effect of a release on the land
surrounding the tank system, taking the following into account:
i)Â Â Â Â Â Â Â Â Â The patterns of rainfall in the region; and
ii)Â Â Â Â Â Â Â Â The current and future uses of the surrounding land.
3)Â Â Â Â Â Â Â Â The owner or operator of a tank system, for which alternative
design and operating practices had been granted in accordance with the
requirements of subsection (g)(1), at which a release of hazardous waste has
occurred from the primary tank system but which has not migrated beyond the
zone of engineering control (as established in the alternative design and
operating practices), must do the following:
A)Â Â Â Â Â Â Â It must comply with the requirements of Section 724.296, except
Section 724.296(d); and
B)Â Â Â Â Â Â Â It must decontaminate or remove contaminated soil to the extent
necessary to do the following:
i)Â Â Â Â Â Â Â Â Â Enable the tank system for which the alternative design and
operating practices were granted to resume operation with the capability for
the detection of releases at least equivalent to the capability it had prior to
the release; and
ii)Â Â Â Â Â Â Â Â Prevent the migration of hazardous waste or hazardous
constituents to groundwater or surface water; and
C)Â Â Â Â Â Â Â If contaminated soil cannot be removed or decontaminated in
accordance with subsection (g)(3)(B), the owner or operator must comply with
the requirement of Section 724.297(b).
4)Â Â Â Â Â Â Â Â The owner or operator of a tank system, for which alternative
design and operating practices had been granted in accordance with the
requirements of subsection (g)(1), at which a release of hazardous waste has
occurred from the primary tank system and which has migrated beyond the zone of
engineering control (as established in the alternative design and operating
practices), must do the following:
A)Â Â Â Â Â Â Â Comply with the requirements of Section 724.296(a), (b), (c),
and (d); and
B)Â Â Â Â Â Â Â Prevent the migration of hazardous waste or hazardous
constituents to groundwater or surface water, if possible, and decontaminate or
remove contaminated soil. If contaminated soil cannot be decontaminated or
removed, or if groundwater has been contaminated, the owner or operator must comply
with the requirements of Section 724.297(b); and
C)Â Â Â Â Â Â Â If repairing, replacing or reinstalling the tank system,
provide secondary containment in accordance with the requirements of
subsections (a) through (f), or make the alternative design and operating
practices demonstration to the Board again, and meet the requirements for new
tank systems in Section 724.292 if the tank system is replaced. The owner or
operator must comply with these requirements even if contaminated soil is
decontaminated or removed and groundwater or surface water has not been
contaminated.
h)Â Â Â Â Â Â Â Â In order to make an alternative design and operating
practices, the owner or operator must follow the following procedures in
addition to those specified in Section 28.1 of the Act and 35 Ill. Adm. Code 101
and 104:
1)Â Â Â Â Â Â Â Â The owner or operator must file a petition for approval of
alternative design and operating practices according to the following schedule:
A)Â Â Â Â Â Â Â For existing tank systems, at least 24 months prior to the date
that secondary containment must be provided in accordance with subsection (a).
B)Â Â Â Â Â Â Â For new tank systems, at least 30 days prior to entering into a
contract for installation.
2)Â Â Â Â Â Â Â Â As part of the petition, the owner or operator must also
submit the following to the Board:
A)Â Â Â Â Â Â Â A description of the steps necessary to conduct the demonstration
and a timetable for completing each of the steps. The demonstration must
address each of the factors listed in subsection  (g)(1) or (g)(2); and
B)Â Â Â Â Â Â Â The portion of the Part B permit application specified in 35
Ill. Adm. Code 703.202.
3)Â Â Â Â Â Â Â Â The owner or operator must complete its showing within 180
days after filing its petition for approval of alternative design and operating
practices.
4)Â Â Â Â Â Â Â Â The Agency must issue or modify the RCRA permit so as to
require the permittee to construct and operate the tank system in the manner
that was provided in any Board order approving alternative design and operating
practices.
i)Â Â Â Â Â Â Â Â Â All tank systems, until such time as secondary containment
that meets the requirements of this Section is provided, must comply with the
following:
1)Â Â Â Â Â Â Â Â For non-enterable underground tanks, a leak test that meets
the requirements of Section 724.291(b)(5) or other tank integrity methods, as
approved or required by the Agency, must be conducted at least annually.
2)Â Â Â Â Â Â Â Â For other than non-enterable underground tanks, the owner or
operator must do either of the following:
A)Â Â Â Â Â Â Â Conduct a leak test, as in subsection (i)(1); or
B)Â Â Â Â Â Â Â Develop a schedule and procedure for an assessment of the
overall condition of the tank system by a qualified Professional Engineer. The
schedule and procedure must be adequate to detect obvious cracks, leaks, and
corrosion or erosion that may lead to cracks and leaks. The owner or operator must
remove the stored waste from the tank, if necessary, to allow the condition of
all internal tank surfaces to be assessed. The frequency of these assessments
must be based on the material of construction of the tank and its ancillary
equipment, the age of the system, the type of corrosion or erosion protection
used, the rate of corrosion or erosion observed during the previous inspection
and the characteristics of the waste being stored or treated.
3)Â Â Â Â Â Â Â Â For ancillary equipment, a leak test or other integrity
assessment, as approved by the Agency, must be conducted at least annually.
BOARD NOTE:Â
The practices described in the API Publication, "Guide for Inspection of
Refinery Equipment", Chapter XIII, "Atmospheric and Low-Pressure
Storage Tanks", incorporated by reference in 35 Ill. Adm. Code 720.111(a),
may be used, where applicable, as a guideline for assessing the overall
condition of the tank system.
4)Â Â Â Â Â Â Â Â The owner or operator must maintain on file at the facility a
record of the results of the assessments conducted in accordance with
subsections (i)(1) through (i)(3).
5)Â Â Â Â Â Â Â Â If a tank system or component is found to be leaking or unfit
for use as a result of the leak test or assessment in subsections (i)(1)
through (1)(3), the owner or operator must comply with the requirements of
Section 724.296.