35 Ill. Adm. Code 724.351
Design and Operating Requirements
Section 724
Section 724.351Â Design and
Operating Requirements
a)Â Â Â Â Â Â Â Â A waste pile (except for an existing portion of a waste pile)
must have the following:
1)Â Â Â Â Â Â Â Â A liner that is designed, constructed, and installed to
prevent any migration of wastes out of the pile into the adjacent subsurface
soil or groundwater or surface water at any time during the active life
(including the closure period) of the waste pile. The liner may be constructed
of materials that may allow waste to migrate into the liner itself (but not
into the adjacent subsurface soil or groundwater or surface water) during the
active life of the facility. The liner must be as follows:
A)Â Â Â Â Â Â Â Constructed of materials that have appropriate chemical
properties and sufficient strength and thickness to prevent failure due to
pressure gradients (including static head and external hydrogeologic forces),
physical contact with the waste or leachate to which they are exposed, climatic
conditions, the stress of installation, and the stress of daily operation;
B)Â Â Â Â Â Â Â Placed upon a foundation or base capable of providing support
to the liner and resistance to pressure gradients above and below the liner to
prevent failure of the liner due to settlement, compression, or uplift; and
C)Â Â Â Â Â Â Â Installed to cover all surrounding earth likely to be in
contact with the waste or leachate; and
2)Â Â Â Â Â Â Â Â A leachate collection and removal system immediately above the
liner that is designed, constructed, maintained, and operated to collect and
remove leachate from the pile. The Agency must specify design and operating
conditions in the permit to ensure that the leachate depth over the liner does
not exceed 30 cm (one foot). The leachate collection and removal system must
be as follows:
A)Â Â Â Â Â Â Â Constructed of materials that are as follows:
i)Â Â Â Â Â Â Â Â Â Chemically resistant to the waste managed in the pile and the
leachate expected to be generated; and
ii)Â Â Â Â Â Â Â Â Of sufficient strength and thickness to prevent collapse
under the pressures exerted by overlying wastes, waste cover materials and by
any equipment used at the pile; and
B)Â Â Â Â Â Â Â Designed and operated to function without clogging through the
scheduled closure of the waste pile.
b)Â Â Â Â Â Â Â Â The owner or operator will be exempted from the requirements
of subsection (a) if the Board grants an adjusted standard pursuant to Section
28.1 of the Act and 35 Ill. Adm. Code 101 and 104. The level of justification
is a demonstration by the owner or operator that alternative design or operating
practices, together with location characteristics, will prevent the migration
of any hazardous constituents (see Section 724.193) into the groundwater or
surface water at any future time. In deciding whether to grant an adjusted
standard, the Board will consider the following:
1)Â Â Â Â Â Â Â Â The nature and quantity of the wastes;
2)Â Â Â Â Â Â Â Â The proposed alternative design and operation;
3)Â Â Â Â Â Â Â Â The hydrogeologic setting of the facility, including
attenuative capacity and thickness of the liners and soils present between the
pile and groundwater or surface water; and
4)Â Â Â Â Â Â Â Â All other factors that influence the quality and mobility of
the leachate produced and the potential for it to migrate to groundwater or
surface water.
c)Â Â Â Â Â Â Â Â The owner or operator of each new waste pile unit, each
lateral expansion of a waste pile unit, and each replacement of an existing
waste pile unit must install two or more liners and a leachate collection and
removal system above and between such liners.
1)Â Â Â Â Â Â Â Â Liners
A)Â Â Â Â Â Â Â The liner system must include the following:
i)Â Â Â Â Â Â Â Â Â A top liner designed and constructed of materials (e.g., a
geomembrane) to prevent the migration of hazardous constituents into such liner
during the active life and post-closure care period; and
ii)Â Â Â Â Â Â Â Â A composite bottom liner, consisting of at least two
components. The upper component must be designed and constructed of materials
(e.g., a geomembrane) to prevent the migration of hazardous constituents into
this component during the active life and post-closure care period. The lower
component must be designed and constructed of materials to minimize the
migration of hazardous constituents if a breach in the upper component were to
occur. The lower component must be constructed of at least 3 feet (91 cm) of
compacted soil material with a hydraulic conductivity of no more than 1 x 10
-7
cm/sec.
B)Â Â Â Â Â Â Â The liners must comply with subsections (a)(1)(A), (a)(1)(B),
and (a)(1)(C).
2)Â Â Â Â Â Â Â Â The leachate collection and removal system immediately above
the top liner must be designed, constructed, operated, and maintained to
collect and remove leachate from the waste pile during the active life and
post-closure care period. The Agency must specify design and operating
conditions in the permit to ensure that the leachate depth over the liner does
not exceed 30 cm (one foot). The leachate collection and removal system must
comply with subsections (c)(3)(C) and (c)(3)(D).
3)Â Â Â Â Â Â Â Â The leachate collection and removal system between the liners,
and immediately above the bottom composite liner in the case of multiple
leachate collection and removal systems, is also a leak detection system
(LDS). This LDS must be capable of detecting, collecting and removing leaks of
hazardous constituents at the earliest practicable time through all areas of the
top liner likely to be exposed to waste or leachate during the active life and
post-closure care period. The requirements for a LDS in this subsection (c)
are satisfied by installation of a system that is, at a minimum, as follows:
A)Â Â Â Â Â Â Â Constructed with a bottom slope of one percent or more;
B)Â Â Â Â Â Â Â Constructed of granular drainage materials with a hydraulic
conductivity of 1x10
-2
cm/sec or more and a thickness of 12 inches
(30.5 cm) or more; or constructed of synthetic or geonet drainage materials
with a transmissivity of 3x10
-5
m
2
/sec or more;
C)Â Â Â Â Â Â Â Constructed of materials that are chemically resistant to the
waste managed in the waste pile and the leachate expected to be generated, and
of sufficient strength and thickness to prevent collapse under the pressures
exerted by overlying wastes, waste cover materials, and equipment used at the
waste pile;
D)Â Â Â Â Â Â Â Designed and operated to minimize clogging during the active
life and post-closure care period; and
E)Â Â Â Â Â Â Â Constructed with sumps and liquid removal methods (e.g., pumps)
of sufficient size to collect and remove liquids from the sump and prevent
liquids from backing up into the drainage layer. Each unit must have its own sumps.
The design of each sump and removal system must provide a method for measuring
and recording the volume of liquids present in the sump and of liquids removed.
4)Â Â Â Â Â Â Â Â The owner or operator must collect and remove pumpable liquids
in the LDS sumps to minimize the head on the bottom liner.
5)Â Â Â Â Â Â Â Â The owner or operator of a LDS that is not located completely
above the seasonal high water table must demonstrate that the operation of the
LDS will not be adversely affected by the presence of groundwater.
d)Â Â Â Â Â Â Â Â The Agency must approve alternative design or operating
practices to those specified in subsection (c) if the owner or operator
demonstrates to the Agency, by way of permit or permit modification application,
that such design or operating practices, together with location characteristics,
will do the following:
1)Â Â Â Â Â Â Â Â Will prevent the migration of any hazardous constituent into
the ground water or surface water at least as effectively as the liners and leachate
collection and removal systems specified in subsection (c); and
2)Â Â Â Â Â Â Â Â Will allow detection of leaks of hazardous constituents
through the top liner at least as effectively.
e)Â Â Â Â Â Â Â Â Subsection (c) does not apply to monofills that are granted a
waiver by the Agency in accordance with Section 724.321(e).
f)Â Â Â Â Â Â Â Â The owner or operator of any replacement waste pile unit is
exempt from subsection (c) if the following are true:
1)Â Â Â Â Â Â Â Â The existing unit was constructed in compliance with the
design standards of section 3004(o)(1)(A)(i) and (o)(5) of the Resource
Conservation and Recovery Act (42 USC 6924(o)(1)(A)(i) and (o)(5)); and
BOARD NOTE:Â The cited provisions required the installation
of two or more liners and a leachate collection system above (in the case of a
landfill) and between such liners, including a top liner designed, operated and
constructed of materials to prevent the migration of any constituent into such
liner during the period the facility remained in operation (including any
post-closure monitoring period), and a lower liner to prevent the migration of
any constituent through the liner during such period. The lower liner was
deemed to satisfy the requirement if it was constructed of at least a 3-foot
thick layer of recompacted clay or other natural material with a permeability
of no more than 1x10
-7
cm/sec.
2)Â Â Â Â Â Â Â Â There is no reason to believe that the liner is not
functioning as designed.
g)Â Â Â Â Â Â Â Â The owner or operator must design, construct, operate, and
maintain a run-on control system capable of preventing flow onto the active
portion of the pile during peak discharge from at least a 25-year storm.
h)Â Â Â Â Â Â Â Â The owner or operator must design, construct, operate, and
maintain a run-off management system to collect and control at least the water
volume resulting from a 24-hour, 25-year storm.
i)Â Â Â Â Â Â Â Â Â Collection and holding facilities (e.g., tanks or basins)
associated with run-on and run-off control systems must be emptied or otherwise
managed expeditiously after storms to maintain design capacity of the system.
j)Â Â Â Â Â Â Â Â Â If the pile contains any particulate matter that may be
subject to wind dispersal, the owner or operator must cover or otherwise manage
the pile to control wind dispersal.
k)Â Â Â Â Â Â Â Â The Agency must specify in the permit all design and operating
practices that are necessary to ensure that the requirements of this Section
are satisfied.