35 Ill. Adm. Code 725.119
Construction Quality Assurance Program
Section 725.119 Construction
Quality Assurance Program
a) CQA Program
1) A construction quality assurance (CQA) program is required for
all surface impoundment, waste pile and landfill units that are required to
comply with Sections 725.321(a), 725.354, and 725.401(a). The program must
ensure that the constructed unit meets or exceeds all design criteria and
specifications in this Part. The program must be developed and implemented
under the direction of a CQA officer that is a registered professional
engineer.
2) The CQA program must address the following physical components,
where applicable:
A) Foundations;
B) Dikes;
C) Low-permeability soil liners;
D) Geomembranes (flexible membrane liners);
E) Leachate collection and removal systems and leak detection
systems; and
F) Final cover systems.
b) Written CQA plan. Before construction begins on a unit
subject to the CQA program under subsection (a), the owner or operator must
develop a written CQA plan. The plan must identify steps that will be used to
monitor and document the quality of materials and the condition and manner of
their installation. The CQA plan must include the following:
1) Identification of applicable units and a description of how
they will be constructed.
2) Identification of key personnel in the development and
implementation of the CQA plan, and CQA officer qualifications.
3) A description of inspection and sampling activities for all
unit components identified in subsection (a)(2), including observations and
tests that will be used before, during and after construction to ensure that
the construction materials and the installed unit components meet the design
specifications. The description must cover: Sampling size and locations;
frequency of testing; data evaluation procedures; acceptance and rejection
criteria for construction materials; plans for implementing corrective
measures; and data or other information to be recorded and retained in the
operating record under Section 725.173.
c) Contents of Program
1) The CQA program must include observations, inspections, tests
and measurements sufficient to ensure the following:
A) Structural stability and integrity of all components of the
unit identified in subsection (a)(2);
B) Proper construction of all components of the liners, leachate
collection and removal system, leak detection system, and final cover system,
according to permit specifications and good engineering practices, and proper
installation of all components (e.g., pipes) according to design
specifications;
C) Conformity of all materials used with design and other material
specifications under 35 Ill. Adm. Code 724.321, 724.351, and 724.401.
2) The CQA program must include test fills for compacted soil
liners, using the same compaction methods as in the full-scale unit, to ensure
that the liners are constructed to meet the hydraulic conductivity requirements
of 35 Ill. Adm. Code 724.321(c)(1), 724.351(c)(1), or 724.401(c)(1) in the
field. Compliance with the hydraulic conductivity requirements must be verified
by using in-situ testing on the constructed test fill. The test fill
requirement is waived where data are sufficient to show that a constructed soil
liner meets the hydraulic conductivity requirements of 35 Ill. Adm. Code
724.321(c)(1), 724.351(c)(1), or 724.401(c)(1) in the field.
d) Certification. The owner or operator of units subject to this
Section must submit to the Agency by certified mail or hand delivery, at least
30 days prior to receiving waste, a certification signed by the CQA officer
that the CQA plan has been successfully carried out and that the unit meets the
requirements of Sections 725.321(a), 725.354, or 725.401(a). The owner or
operator may receive waste in the unit after 30 days from the Agency's receipt
of the CQA certification unless the Agency determines in writing that the
construction is not acceptable, or extends the review period for a maximum of
30 more days, or seeks additional information from the owner or operator during
this period. Documentation supporting the CQA officer's certification must be
furnished to the Agency upon request.
e) Final Agency determinations pursuant to this Section are
deemed to be permit denials for purposes of appeal to the Board pursuant to
Section 40 of the Environmental Protection Act.