35 Ill. Adm. Code 725.152
Content of Contingency Plan
Section 725
Section 725.152Â Content of
Contingency Plan
a)Â Â Â Â Â Â Â Â The contingency plan must describe the actions facility
personnel must take to comply with Sections 725.151 and 725.156 in response to
fires, explosions, or any unplanned sudden or non-sudden release of hazardous
waste or hazardous waste constituents to air, soil, or surface water at the
facility.
b)Â Â Â Â Â Â Â Â If the owner or operator has already prepared a federal Spill
Prevention Control and Countermeasures (SPCC) Plan in accordance with 40 CFR
112, or some other emergency or contingency plan, it needs only amend that plan
to incorporate hazardous waste management provisions that are sufficient to
comply with the requirements of this Part. Â The owner or operator may develop
one contingency plan that meets all regulatory requirements. USEPA has
recommended that the plan be based on the National Response Team's Integrated
Contingency Plan Guidance (One Plan). When modifications are made to non-RCRA
provisions in an integrated contingency plan, the changes do not trigger the
need for a RCRA permit modification.
BOARD NOTE:Â The federal One Plan
guidance appeared in the Federal Register at 61 Fed. Reg. 28642 (June 5, 1996),
and was corrected at 61 Fed. Reg. 31103 (June 19, 1996). USEPA, Office of Resource
Conservation and Recovery, Chemical Emergency Preparedness and Prevention
Office, has made these documents available on-line for examination and download
at yosemite.epa.gov/oswer/Ceppoweb.nsf/content/serc-lepc-publications.htm.
c)Â Â Â Â Â Â Â Â The plan must describe arrangements agreed to by local police
department, fire departments, hospitals, contractors, and State and local
emergency response teams to coordinate emergency services, pursuant to Section
725.137.
d)Â Â Â Â Â Â Â Â The plan must list names, addresses, and phone numbers (office
and home) of all persons qualified to act as emergency coordinator (see Section
725.155), and this list must be kept up to date. Where more than one person is
listed one must be named as primary emergency coordinator and others must be
listed in the order in which they will assume responsibility as alternates.
e)Â Â Â Â Â Â Â Â The plan must include a list of all emergency equipment at the
facility (such as fire extinguishing systems, spill control equipment,
communications and alarm systems (internal and external), and decontamination
equipment) where this equipment is required. This list must be kept up to
date. In addition, the plan must include the location and a physical
description of each item on the list and a brief outline of its capabilities.
f)Â Â Â Â Â Â Â Â The plan must include an evacuation plan for facility personnel
where there is a possibility that evacuation could be necessary. This plan
must describe signals to be used to begin evacuation, evacuation routes, and
alternate evacuation routes (in cases where the primary routes could be blocked
by releases of hazardous waste or fires).