35 Ill. Adm. Code 725.293
Containment and Detection of Releases
Section 725
Section 725.293Â Containment
and Detection of Releases
a)Â Â Â Â Â Â Â Â In order to prevent the release of hazardous waste or
hazardous constituents to the environment, secondary containment that meets the
requirements of this Section must be provided (except as provided in
subsections (f) and (g)).
1)Â Â Â Â Â Â Â Â For a new or existing tank system or component, prior to its
being put into service.
2)Â Â Â Â Â Â Â Â For a tank system that stores or treats materials that become
hazardous wastes, within two years after the hazardous waste listing, or when
the tank system has reached 15 years of age, whichever comes later.
b)Â Â Â Â Â Â Â Â Secondary containment systems must be as follows:
1)Â Â Â Â Â Â Â Â Designed, installed, and operated to prevent any migration of
wastes or accumulated liquid out of the system to the soil, groundwater, or
surface water at any time during the use of the tank system; and
2)Â Â Â Â Â Â Â Â Capable of detecting and collecting releases and accumulated
liquids until the collected material is removed.
c)Â Â Â Â Â Â Â Â To meet the requirements of subsection (b), secondary
containment systems must be at a minimum as follows:
1)Â Â Â Â Â Â Â Â Constructed of or lined with materials that are compatible
with the wastes to be placed in the tank system and of sufficient strength and
thickness to prevent failure due to pressure gradients (including static head
and external hydrological forces), physical contact with the waste to which
they are exposed, climatic conditions, the stress of installation, and the
stress of daily operation (including stresses from nearby vehicular traffic);
2)Â Â Â Â Â Â Â Â Placed on a foundation or base capable of providing support to
the secondary containment system and resistance to pressure gradients above and
below the system and capable of preventing failure due to settlement,
compression, or uplift;
3)Â Â Â Â Â Â Â Â Provided with a leak detection system that is designed and
operated so that it will detect the failure of either the primary and secondary
containment structure or any release of hazardous waste or accumulated liquid
in the secondary containment system within 24 hours, or as otherwise provided
in the RCRA permit if the operator has demonstrated to the Agency, by way of
permit application, that the existing detection technology or site conditions
will not allow detection of a release within 24 hours;
4)Â Â Â Â Â Â Â Â Sloped or otherwise designed or operated to drain and remove
liquids resulting from leaks, spills, or precipitation. Spilled or leaked
waste and accumulated precipitation must be removed from the secondary
containment system within 24 hours, or as otherwise provided in the RCRA permit
if the operator has demonstrated to the Agency, by way of permit application,
that removal of the released waste or accumulated precipitation cannot be
accomplished within 24 hours.
BOARD NOTE:Â
If the collected material is a hazardous waste under 35 Ill. Adm. Code 721, it
is subject to management as a hazardous waste in accordance with all applicable
requirements of 35 Ill. Adm. Code 722 through 728. If the collected material
is discharged through a point source to waters of the State, it is subject to
the NPDES permit requirement of Section 12(f) of the Environmental Protection
Act and 35 Ill. Adm. Code 309. If discharged to a Publicly Owned Treatment
Works (POTW), it is subject to the requirements of 35 Ill. Adm. Code 307 and
310. If the collected material is released to the environment, it may be
subject to the reporting requirements of 35 Ill. Adm. Code 750.410 and federal 40
CFR 302.6.
d)Â Â Â Â Â Â Â Â Secondary containment for tanks must include one or more of
the following devices:
1)Â Â Â Â Â Â Â Â A liner (external to the tank);
2)Â Â Â Â Â Â Â Â A vault;
3)Â Â Â Â Â Â Â Â A double-walled tank; or
4)Â Â Â Â Â Â Â Â An equivalent device as approved by the Board in an adjusted
standards proceeding.
e)Â Â Â Â Â Â Â Â In addition to the requirements of subsections (b), (c), and
(d), secondary containment systems must satisfy the following requirements:
1)Â Â Â Â Â Â Â Â External liner systems must be as follows:
A)Â Â Â Â Â Â Â Designed or operated to contain 100 percent of the capacity of
the largest tank within the liner system's boundary;
B)Â Â Â Â Â Â Â Designed or operated to prevent run-on or infiltration of
precipitation into the secondary containment system, unless the collection
system has sufficient excess capacity to contain run-on or infiltration. Such
additional capacity must be sufficient to contain precipitation from a 25-year,
24-hour rainfall event;
C)Â Â Â Â Â Â Â Free of cracks or gaps; and
D)Â Â Â Â Â Â Â Designed and installed to completely surround the tank and to
cover all surrounding earth likely to come into contact with the waste if
released from the tanks (i.e., capable of preventing lateral as well as
vertical migration of the waste).
2)Â Â Â Â Â Â Â Â Vault systems must be as follows:
A)Â Â Â Â Â Â Â Designed or operated to contain 100 percent of the capacity of
the largest tank within the vault system's boundary;
B)Â Â Â Â Â Â Â Designed or operated to prevent run-on or infiltration of
precipitation into the secondary containment system, unless the collection
system has sufficient excess capacity to contain run-on or infiltration. Such
additional capacity must be sufficient to contain precipitation from a 25-year,
24-hour rainfall event;
C)Â Â Â Â Â Â Â Constructed with chemical-resistant water stops in place at all
joints (if any);
D)Â Â Â Â Â Â Â Provided with an impermeable interior coating or lining that is
compatible with the stored waste and that will prevent migration of waste into
the concrete;
E)Â Â Â Â Â Â Â Provided with a means to protect against the formation of and
ignition of vapors within the vault, if the waste being stored or treated:
i)Â Â Â Â Â Â Â Â Â Meets the definition of ignitable waste under 35 Ill. Adm.
Code 721.121; or
ii)Â Â Â Â Â Â Â Â Meets the definition of reactive waste under 35 Ill. Adm.
Code 721.123 and may form an ignitable or explosive vapor; and
F)Â Â Â Â Â Â Â Â Provided with an exterior moisture barrier or be otherwise
designed or operated to prevent migration of moisture into the vault if the
vault is subject to hydraulic pressure.
3)Â Â Â Â Â Â Â Â Double-walled tanks must be as follows:
A)Â Â Â Â Â Â Â Designed as an integral structure (i.e., an inner tank within
an outer shell) so that any release from the inner tank is contained by the
outer shell;
B)Â Â Â Â Â Â Â Protected, if constructed of metal, from both corrosion of the
primary tank interior and the external surface of the outer shell; and
C)Â Â Â Â Â Â Â Provided with a built-in continuous leak detection system
capable of detecting a release within 24 hours or as otherwise provided in the
RCRA permit if the operator has demonstrated to the Agency, by way of permit
application, that the existing leak detection technology or site conditions
will not allow detection of a release within 24 hours.
BOARD NOTE:Â
The provisions outlined in the Steel Tank Institute (STI) document "Standard
for Dual Wall Underground Steel Storage Tanks", incorporated by reference
in 35 Ill. Adm. Code 720.111(a), may be used as guidelines for aspects of the
design of underground steel double-walled tanks.
f)Â Â Â Â Â Â Â Â Ancillary equipment must be provided with full secondary
containment (e.g., trench, jacketing, double-walled piping, etc.) that meets
the requirements of subsections (c) and (h), except for the following:
1)Â Â Â Â Â Â Â Â Aboveground piping (exclusive of flanges, joints, valves, and
connections) that are visually inspected for leaks on a daily basis;
2)Â Â Â Â Â Â Â Â Welded flanges, welded joints, and welded connections that are
visually inspected for leaks on a daily basis;
3)Â Â Â Â Â Â Â Â Sealless or magnetic coupling pumps and sealless valves that
are visually inspected for leaks on a daily basis; and
4)Â Â Â Â Â Â Â Â Pressurized aboveground piping systems with automatic shut-off
devices (e.g., excess flow check valves, flow metering shutdown devices, loss
of pressure actuated shut-off devices, etc.) that are visually inspected for
leaks on a daily basis.
g)Â Â Â Â Â Â Â Â Pursuant to Section 28.1 of the Environmental Protection Act,
and in accordance with Subpart D of 35 Ill. Adm. Code 104, an adjusted standard
will be granted by the Board regarding alternative design and operating
practices only if the Board finds either that the alternative design and
operating practices, together with location characteristics, will prevent the
migration of any hazardous waste or hazardous constituents into the groundwater
or surface water at least as effectively as secondary containment during the
active life of the tank system, or that in the event of a release that does
migrate to groundwater or surface water, no substantial present or potential
hazard will be posed to human health or the environment. New underground tank
systems may not receive an adjusted standard from the secondary containment
requirements of this Section through a justification in accordance with
subsection (g)(2).
1)Â Â Â Â Â Â Â Â When determining whether to grant alternative design and
operating practices based on a demonstration of equivalent protection of
groundwater and surface water, the Board will consider whether the petitioner
has justified an adjusted standard based on the following factors:
A)Â Â Â Â Â Â Â The nature and quantity of the waste;
B)Â Â Â Â Â Â Â The proposed alternate design and operation;
C)Â Â Â Â Â Â Â The hydrogeologic setting of the facility, including the
thickness of soils between the tank system and groundwater; and
D)Â Â Â Â Â Â Â All other factors that would influence the quality and mobility
of the hazardous constituents and the potential for them to migrate to
groundwater or surface water.
2)Â Â Â Â Â Â Â Â In deciding whether to grant alternative design and operating
practices based on a demonstration of no substantial present or potential
hazard, the Board will consider whether the petitioner has justified an
adjusted standard based on the following factors:
A)Â Â Â Â Â Â Â The potential adverse effects on groundwater, surface water,
and land quality taking the following into account:
i)Â Â Â Â Â Â Â Â Â The physical and chemical characteristics of the waste in the
tank system, including its potential for migration;
ii)Â Â Â Â Â Â Â Â The hydrogeological characteristics of the facility and
surrounding land;
iii)Â Â Â Â Â Â Â The potential for health risks caused by human exposure to
waste constituents;
iv)Â Â Â Â Â Â Â The potential for damage to wildlife; crops, vegetation, and
physical structures caused by exposure to waste constituents; and
v)Â Â Â Â Â Â Â Â The persistence and permanence of the potential adverse
effects;
B)Â Â Â Â Â Â Â The potential adverse effects of a release on groundwater
quality, taking the following into account:
i)Â Â Â Â Â Â Â Â Â The quantity and quality of groundwater and the direction of
groundwater flow;
ii)Â Â Â Â Â Â Â Â The proximity and withdrawal rates of water in the area;
iii)Â Â Â Â Â Â Â The current and future uses of groundwater in the area; and
iv)Â Â Â Â Â Â Â The existing quality of groundwater, including other sources
of contamination and their cumulative impact on the groundwater quality;
C)Â Â Â Â Â Â Â The potential adverse effects of a release on surface water
quality, taking the following into account:
i)Â Â Â Â Â Â Â Â Â The quantity and quality of groundwater and the direction of
groundwater flow;
ii)Â Â Â Â Â Â Â Â The patterns of rainfall in the region;
iii)Â Â Â Â Â Â Â The proximity of the tank system to surface waters;
iv)Â Â Â Â Â Â Â The current and future uses of surface waters in the area and
water quality standards established for those surface waters; and
v)Â Â Â Â Â Â Â Â The existing quality of surface water, including other sources
of contamination and the cumulative impact on surface water quality; and
D)Â Â Â Â Â Â Â The potential adverse effects of a release on the land
surrounding the tank system, taking the following into account:
i)Â Â Â Â Â Â Â Â Â The patterns of rainfall in the region; and
ii)Â Â Â Â Â Â Â Â The current and future uses of the surrounding land.
3)Â Â Â Â Â Â Â Â The owner or operator of a tank system, for which alternative
design and operating practices had been granted in accordance with the
requirements of subsection (g)(1), at which a release of hazardous waste has
occurred from the primary tank system but has not migrated beyond the zone of
engineering control (as established in the alternative design and operating
practices), must fulfill the following requirements:
A)Â Â Â Â Â Â Â It must comply with the requirements of Section 725.296, except
Section 725.296(d); and
B)Â Â Â Â Â Â Â It must decontaminate or remove contaminated soil to the extent
necessary to assure the following:
i)Â Â Â Â Â Â Â Â Â It must enable the tank system, for which alternative design
and operating practices were granted, to resume operation with the capability
for the detection of and response to releases at least equivalent to the
capability it had prior to the release; and
ii)Â Â Â Â Â Â Â Â It must prevent the migration of hazardous waste or hazardous
constituents to groundwater or surface water.
C)Â Â Â Â Â Â Â If contaminated soil cannot be removed or decontaminated in
accordance with subsection (g)(3)(B), it must comply with the requirements of
Section 725.297(b).
4)Â Â Â Â Â Â Â Â The owner or operator of a tank system, for which alternative
design and operating practices had been granted in accordance with the
requirements of subsection (g)(1), at which a release of hazardous waste has
occurred from the primary tank system and has migrated beyond the zone of
engineering control (as established in the alternative design and operating
practices, must fulfill the following requirements:
A)Â Â Â Â Â Â Â It must comply with the requirements of Section 725.296(a), (b),
(c), and (d); and
B)Â Â Â Â Â Â Â It must prevent the migration of hazardous waste or hazardous
constituents to groundwater or surface water, if possible, and decontaminate or
remove contaminated soil. If contaminated soil cannot be decontaminated or
removed, or if groundwater has been contaminated, the owner or operator must
comply with the requirements of Section 725.297(b);
C)Â Â Â Â Â Â Â If repairing, replacing, or reinstalling the tank system, it
must provide secondary containment in accordance with the requirements of
subsections (a) through (f), or make the alternative design and operating
practices demonstration to the Board again with respect to secondary
containment and meet the requirements for new tank systems in Section 725.292
if the tank system is replaced. The owner or operator must comply with these
requirements even if contaminated soil is decontaminated or removed, and
groundwater or surface water has not been contaminated.
h)Â Â Â Â Â Â Â Â In order to make an alternative design and operating practices
demonstration, the owner or operator must follow the following procedures, in
addition to those specified in Section 28.1 of the Act and Subpart D of 35 Ill.
Adm. Code 104:
1)Â Â Â Â Â Â Â Â The owner or operator must file a petition for approval of
alternative design and operating practices according to the following schedule:
A)Â Â Â Â Â Â Â For existing tank systems, at least 24 months prior to the date
that secondary containment must be provided in accordance with subsection (a);
and
B)Â Â Â Â Â Â Â For new tank systems, at least 30 days prior to entering into a
contract for installation of the tank system.
2)Â Â Â Â Â Â Â Â As part of the petition, the owner or operator must also
submit the following to the Board:
A)Â Â Â Â Â Â Â A description of the steps necessary to conduct the
demonstration and a timetable for completing each of the steps. The
demonstration must address each of the factors listed in subsection (g)(1) or
(g)(2); and
B)Â Â Â Â Â Â Â The portion of the Part B permit application specified in 35
Ill. Adm. Code 703.202.
3)Â Â Â Â Â Â Â Â The owner or operator must complete its showing within 180
days after filing its petition for approval of alternative design and operating
practices.
4)Â Â Â Â Â Â Â Â The Agency must issue or modify the RCRA permit so as to
require the permittee to construct and operate the tank system in the manner
that was provided in any Board order approving alternative design and operating
practices.
i)Â Â Â Â Â Â Â Â Â All tank systems, until such time as secondary containment
meeting the requirements of this Section is provided, must comply with the
following:
1)Â Â Â Â Â Â Â Â For non-enterable underground tanks, a leak test that meets
the requirements of Section 725.291(b)(5) must be conducted at least annually.
2)Â Â Â Â Â Â Â Â For other than non-enterable underground tanks and for all
ancillary equipment, the owner or operator must either conduct a leak test, as
described in subsection (i)(1), or an internal inspection or other tank
integrity examination, by a qualified Professional Engineer, that addresses
cracks, leaks, and corrosion or erosion at least annually. The owner or
operator must remove the stored waste from the tank, if necessary, to allow the
condition of all internal tank surfaces to be assessed.
BOARD NOTE:Â
The practices described in API Publication "Guide for Inspection of Refinery
Equipment", Chapter XIII, "Atmospheric and Low Pressure Storage
Tanks", incorporated by reference in 35 Ill. Adm. Code 720.111(a), may be
used, when applicable, as guidelines for assessing the overall condition of the
tank system.
3)Â Â Â Â Â Â Â Â The owner or operator must maintain on file at the facility a
record of the results of the assessments conducted in accordance with
subsections (i)(1) through (i)(3).
4)Â Â Â Â Â Â Â Â If a tank system or component is found to be leaking or unfit
for use as a result of the leak test or assessment in subsections (i)(1)
through (i)(3), the owner or operator must comply with the requirements of
Section 725.296.