35 Ill. Adm. Code 725.380
Closure and Post-Closure Care
Section 725
Section 725.380Â Closure and Post-Closure
Care
a)Â Â Â Â Â Â Â Â In the closure plan under Section 725.212 and the post-closure
plan under Section 725.218 the owner or operator must address the following
objectives and indicate how they will be achieved:
1)Â Â Â Â Â Â Â Â Control of the migration of hazardous waste and hazardous waste
constituents from the treated area into the groundwater;
2)Â Â Â Â Â Â Â Â Control of the release of contaminated runoff from the
facility into surface water;
3)Â Â Â Â Â Â Â Â Control of the release of airborne particulate contaminants
caused by wind erosion; and
4)Â Â Â Â Â Â Â Â Compliance with Section 725.376 concerning the growth of
food-chain crops.
b)Â Â Â Â Â Â Â Â The owner or operator must consider at least the following
factors in addressing the closure and post-closure care objectives of subsection
(a):
1)Â Â Â Â Â Â Â Â The type and amount of hazardous waste and hazardous waste
constituents applied to the land treatment facility;
2)Â Â Â Â Â Â Â Â The mobility and the expected rate of migration of the
hazardous waste and hazardous waste constituents;
3)Â Â Â Â Â Â Â Â The site location, topography, and surrounding land use with
respect to the potential effects of pollutant migration (e.g., proximity to
groundwater, surface water, and drinking water sources);
4)Â Â Â Â Â Â Â Â Climate, including amount, frequency, and pH of precipitation;
5)Â Â Â Â Â Â Â Â Geological and soil profiles and surface and subsurface
hydrology of the site and soil characteristics, including cation exchange
capacity, total organic carbon, and pH;
6)Â Â Â Â Â Â Â Â Unsaturated zone monitoring information obtained under Section
725.378; and
7)Â Â Â Â Â Â Â Â The type, concentration, and depth of migration of hazardous
waste constituents in the soil, as compared to their background concentrations.
c)Â Â Â Â Â Â Â Â The owner or operator must consider at least the following
methods in addressing the closure and post-closure care objectives of subsection
(a):
1)Â Â Â Â Â Â Â Â Removal of contaminated soils;
2)Â Â Â Â Â Â Â Â Placement of a final cover, considering the following:
A)Â Â Â Â Â Â Â Functions of the cover (e.g., infiltration control, erosion and
runoff control, and wind erosion control); and
B)Â Â Â Â Â Â Â Characteristics of the cover, including material, final surface
contours, thickness, porosity and permeability, slope, length of run of slope,
and type of vegetation on the cover; and
3)Â Â Â Â Â Â Â Â Monitoring of groundwater.
d)Â Â Â Â Â Â Â Â In addition to the requirements of Subpart G of this Part during
the closure period the owner or operator of a land treatment facility must do
the following:
1)Â Â Â Â Â Â Â Â It must continue unsaturated zone monitoring in a manner and
frequency specified in the closure plan, except that soil pore liquid
monitoring may be terminated 90 days after the last application of waste to the
treatment zone;
2)Â Â Â Â Â Â Â Â It must maintain the run-on control system required under
Section 725.372(b);
3)Â Â Â Â Â Â Â Â It must maintain the run-off management system required under
Section 725.372(c); and
4)Â Â Â Â Â Â Â Â It must control wind dispersal of particulate matter that may
be subject to wind dispersal.
e)Â Â Â Â Â Â Â Â For the purpose of complying with Section 725.215, when
closure is completed the owner or operator may submit to the Agency
certification both by the owner or operator and by an independent, qualified
soil scientist, in lieu of a qualified Professional Engineer, that the facility
has been closed in accordance with the specifications in the approved closure
plan.
f)Â Â Â Â Â Â Â Â In addition to the requirements of Section 725.217, during the
post-closure care period the owner or operator of a land treatment unit must
fulfill the following requirements:
1)Â Â Â Â Â Â Â Â It must continue soil-core monitoring by collecting and
analyzing samples in a manner and frequency specified in the post-closure plan;
2)Â Â Â Â Â Â Â Â It must restrict access to the unit as appropriate for its
post-closure use;
3)Â Â Â Â Â Â Â Â It must assure that growth of food chain crops complies with
Section 725.376; and
4)Â Â Â Â Â Â Â Â It must control wind dispersal of hazardous waste.