35 Ill. Adm. Code 725.543
Design and Operating Requirements
Section 725
Section 725.543Â Design and Operating
Requirements
a)Â Â Â Â Â Â Â Â Drip pads must fulfill the following requirements:
1)Â Â Â Â Â Â Â Â It must not be constructed of earthen materials, wood, or
asphalt, unless the asphalt is structurally supported;
2)Â Â Â Â Â Â Â Â It must be sloped to free-drain to the associated collection
system treated wood drippage, rain, other waters, or solutions of drippage and
water or other wastes;
3)Â Â Â Â Â Â Â Â It must have a curb or berm around the perimeter;
4)Â Â Â Â Â Â Â Â In addition, the drip pad must fulfill the following
requirements:
A)Â Â Â Â Â Â Â It must have a hydraulic conductivity of less than or equal to 1
x
10
-7
centimeters per second, e.g., existing concrete drip pads must be sealed,
coated, or covered with a surface material with a hydraulic conductivity of
less than or equal to 1 x 10
-7
centimeters per second such that the
entire surface where drippage occurs or may run across is capable of containing
such drippage and mixtures of drippage and precipitation, materials, or other
wastes while being routed to an associated collection system. This surface
material must be maintained free of cracks and gaps that could adversely affect
its hydraulic conductivity, and the material must be chemically compatible with
the preservatives that contact the drip pad. The requirements of this
provision apply only to the existing drip pads and those drip pads for which
the owner or operator elects to comply with Section 725.542(b) instead of Section
725.542(a).
B)Â Â Â Â Â Â Â The owner or operator must obtain and keep on file at the
facility a written assessment of the drip pad, reviewed and certified by a
qualified Professional Engineer that attests to the results of the evaluation.
The assessment must be reviewed, updated, and recertified annually. The
evaluation must document the extent to which the drip pad meets the design and
operating standards of this Section, except for in subsection (b).
5)Â Â Â Â Â Â Â Â It must be of sufficient structural strength and thickness to
prevent failure due to physical contact, climatic conditions, the stress of
installation, and the stress of daily operations, e.g., variable and moving
loads such as vehicle traffic, movement of wood, etc.
BOARD NOTE:Â
In judging the structural integrity requirement of this subsection (a), the
Agency should generally consider applicable standards established by
professional organizations generally recognized by the industry, including ACI
318-83 (Building Code Requirements for Reinforced Concrete) or ASTM C 94-90
(Standard Specification for Ready-Mixed Concrete), incorporated by reference in
35 Ill. Adm. Code 720.111(a).
b)Â Â Â Â Â Â Â Â If an owner or operator elects to comply with Section 725.542(a)
instead of Section 725.542(b), the drip pad must have the following features:
1)Â Â Â Â Â Â Â Â A synthetic liner installed below the drip pad that is
designed, constructed, and installed to prevent leakage from the drip pad into
the adjacent subsurface soil or groundwater or surface water at any time during
the active life (including the closure period) of the drip pad. The liner must
be constructed of materials that will prevent waste from being absorbed into
the liner and to prevent releases into the adjacent subsurface soil or groundwater
or surface water during the active life of the facility. The liner must be
constructed as follows:
A)Â Â Â Â Â Â Â It must be constructed of materials that have appropriate
chemical properties and sufficient strength and thickness to prevent failure
due to pressure gradients (including static head and external hydrogeologic
forces), physical contact with the waste or drip pad leakage to which they are
exposed, climatic conditions, the stress of installation, and the stress of
daily operation (including stresses from vehicular traffic on the drip pad);
B)Â Â Â Â Â Â Â It must be placed upon a foundation or base capable of
providing support to the liner and resistance to pressure gradients above and
below the liner to prevent failure of the liner due to settlement, compression,
or uplift; and
C)Â Â Â Â Â Â Â It must be installed to cover all surrounding earth that could
come in contact with the waste or leakage; and
2)Â Â Â Â Â Â Â Â A leakage detection system immediately above the liner that is
designed, constructed, maintained, and operated to detect leakage from the drip
pad. The leakage detection system must be constructed as follows:
A)Â Â Â Â Â Â Â It must be constructed of materials that fulfill the following
requirements:
i)Â Â Â Â Â Â Â Â Â They are chemically resistant to the waste managed in the
drip pad and the leakage that might be generated; and
ii)Â Â Â Â Â Â Â Â They are of sufficient strength and thickness to prevent
collapse under the pressures exerted by overlaying materials and by any
equipment used at the drip pad; and
B)Â Â Â Â Â Â Â It must be designed and operated to function without clogging
through the scheduled closure of the drip pad; and
C)Â Â Â Â Â Â Â It must be designed so that it will detect the failure of the
drip pad or the presence of a release of hazardous waste or accumulated liquid
at the earliest practicable time.
3)Â Â Â Â Â Â Â Â A leakage collection system immediately above the liner that
is designed, constructed, maintained, and operated to collect leakage from the
drip pad such that it can be removed from below the drip pad. The date, time,
and quantity of any leakage collected in this system and removed must be
documented in the operating log.
c)Â Â Â Â Â Â Â Â Drip pads must be maintained such that they remain free of
cracks, gaps, corrosion, or other deterioration that could cause hazardous
waste to be released from the drip pad.
BOARD NOTE:Â
See subsection (m) for remedial action required if deterioration or leakage is
detected.
d)Â Â Â Â Â Â Â Â The drip pad and associated collection system must be designed
and operated to convey, drain and collect liquid resulting from drippage or
precipitation in order to prevent run-off.
e)Â Â Â Â Â Â Â Â Unless the drip pad is protected by a structure, as described
in Section 725.540(b), the owner or operator must design, construct, operate,
and maintain a run-on control system capable of preventing flow onto the drip
pad during peak discharge from at least a 24-hour, 25-year storm, unless the
system has sufficient excess capacity to contain any run-on that might enter
the system.
f)Â Â Â Â Â Â Â Â Unless the drip pad is protected by a structure or cover, as
described in Section 725.540(b), the owner or operator must design, construct,
operate, and maintain a run-off management system to collect and control at
least the water volume resulting from a 24-hour, 25-year storm.
g)Â Â Â Â Â Â Â Â The drip pad must be evaluated to determine that it meets the
requirements of subsections (a) through (f). The owner or operator must obtain
a statement from a qualified, Professional Engineer certifying that the drip
pad design meets the requirements of this Section.
h)Â Â Â Â Â Â Â Â Drippage and accumulated precipitation must be removed from
the associated collection system as necessary to prevent overflow onto the drip
pad.
i)Â Â Â Â Â Â Â Â Â The drip pad surface must be cleaned thoroughly at least once
every seven days using an appropriate and effective cleaning technique,
including but not limited to, rinsing, washing with detergents or other
appropriate solvents, or steam cleaning, with residues being properly managed, such
that accumulated residues of hazardous waste or other materials are removed as
to allow weekly inspections of the entire drip pad surface without interference
or hindrance from accumulated residues of hazardous waste or other materials on
the drip pad. The owner or operator must document, in the facility's operating
log, the date and time of each cleaning and the cleaning procedure.
j)Â Â Â Â Â Â Â Â Â Drip pads must be operated and maintained in a manner to
minimize tracking of hazardous waste or hazardous waste constituents off the
drip pad as a result of activities by personnel or equipment.
k)Â Â Â Â Â Â Â Â After being removed from the treatment vessel, treated wood
from pressure and non-pressure processes must be held on the drip pad until
drippage has ceased. The owner or operator must maintain records sufficient to
document that all treated wood is held on the pad, in accordance with this
Section, following treatment.
l)Â Â Â Â Â Â Â Â Â Collection and holding units associated with run-on and
run-off control systems must be emptied or otherwise managed as soon as
possible after storms to maintain design capacity of the system.
m)Â Â Â Â Â Â Â Throughout the active life of the drip pad, if the owner or
operator detects a condition that may have caused or has caused a release of
hazardous waste, the condition must be repaired within a reasonably prompt
period of time following discovery, in accordance with the following
procedures:
1)Â Â Â Â Â Â Â Â Upon detection of a condition that may have caused or has caused
a release of hazardous waste (e.g., upon detection of leakage in the leak
detection system), the owner or operator must perform the following acts:
A)Â Â Â Â Â Â Â It must enter a record of the discovery in the facility
operating log;
B)Â Â Â Â Â Â Â It must immediately remove from service the portion of the drip
pad affected by the condition;
C)Â Â Â Â Â Â Â It must determine what steps must be taken to repair the drip
pad, clean up any leakage from below the drip pad, and establish a schedule for
accomplishing the clean up and repairs;
D)Â Â Â Â Â Â Â Within 24 hours after discovery of the condition, the owner or
operator must notify the Agency of the condition and, within 10 working days,
provide written notice to the Agency with a description of the steps that will
be taken to repair the drip pad and clean up any leakage, and the schedule for
accomplishing this work.
2)Â Â Â Â Â Â Â Â The Agency must:Â review the information submitted; make a
determination regarding whether the pad must be removed from service completely
or partially until repairs and clean up are complete; and notify the owner or
operator of the determination and the underlying rationale in writing.
3)Â Â Â Â Â Â Â Â Upon completing all repairs and clean up, the owner or
operator must notify the Agency in writing and provide a certification, signed
by an independent, qualified, registered professional engineer, that the
repairs and clean up have been completed according to the written plan
submitted in accordance with subsection (m)(1)(D).
n)Â Â Â Â Â Â Â Â The owner or operator must maintain, as part of the facility
operating log, documentation of past operating and waste handling practices.Â
This must include identification of preservative formulations used in the past,
a description of drippage management practices and a description of treated
wood storage and handling practices.