35 Ill. Adm. Code 725.986
Standards: Surface Impoundments
Section 725
Section 725.986Â Standards:Â
Surface Impoundments
a)Â Â Â Â Â Â Â Â The provisions of this Section apply to the control of air
pollutant emissions from surface impoundments for which Section 725.983(b) of
this Subpart CC references the use of this Section for such air emission
control.
b)Â Â Â Â Â Â Â Â The owner or operator must control air pollutant emissions
from the surface impoundment by installing and operating either of the
following:
1)Â Â Â Â Â Â Â Â A floating membrane cover in accordance with the provisions
specified in subsection (c); or
2)Â Â Â Â Â Â Â Â A cover that is vented through a closed-vent system to a
control device in accordance with the requirements specified in subsection (d).
c)Â Â Â Â Â Â Â Â The owner or operator that controls air pollutant emissions
from a surface impoundment using a floating membrane cover must meet the
requirements specified in subsections (c)(1) through (c)(3).
1)Â Â Â Â Â Â Â Â The surface impoundment must be equipped with a floating
membrane cover designed to meet the following specifications:
A)Â Â Â Â Â Â Â The floating membrane cover must be designed to float on the
liquid surface during normal operations and form a continuous barrier over the
entire surface area of the liquid;
B)Â Â Â Â Â Â Â The cover must be fabricated from a synthetic membrane material
that is either of the following:
i)Â Â Â Â Â Â Â Â Â High density polyethylene (HDPE) with a thickness no less
than 2.5 millimeters (mm) (0.10 inch); or
ii)Â Â Â Â Â Â Â Â A material or a composite of different materials determined
to have both organic permeability properties that are equivalent to those of
the material listed in subsection (c)(1)(B)(i) and chemical and physical
properties that maintain the material integrity for the intended service life
of the material;
C)Â Â Â Â Â Â Â The cover must be installed in a manner such that there are no
visible cracks, holes, gaps, or other open spaces between cover section seams
or between the interface of the cover edge and its foundation mountings;
D)Â Â Â Â Â Â Â Except as provided for in subsection (c)(1)(E), each opening in
the floating membrane cover must be equipped with a closure device so designed
as to operate that when the closure device is secured in the closed position
there are no visible cracks, holes, gaps, or other open spaces in the closure
device or between the perimeter of the cover opening and the closure device;
E)Â Â Â Â Â Â Â The floating membrane cover may be equipped with one or more
emergency cover drains for removal of stormwater. Each emergency cover drain
must be equipped with a slotted membrane fabric cover that covers at least 90
percent of the area of the opening or a flexible fabric sleeve seal; and
F)Â Â Â Â Â Â Â Â The closure devices must be made of suitable materials that
will minimize exposure of the hazardous waste to the atmosphere, to the extent
practical, and will maintain the integrity of the closure devices throughout
their intended service life. Factors to be considered when selecting the
materials of construction and designing the cover and closure devices must
include the following:Â the organic vapor permeability; the effects of any
contact with the liquid and its vapor managed in the surface impoundment; the
effects of outdoor exposure to wind, moisture, and sunlight; and the operating
practices used for the surface impoundment on which the floating membrane cover
is installed.
2)Â Â Â Â Â Â Â Â Whenever a hazardous waste is in the surface impoundment, the
floating membrane cover must float on the liquid and each closure device must
be secured in the closed position, except as follows:
A)Â Â Â Â Â Â Â Opening of closure devices or removal of the cover is allowed
at the following times:
i)Â Â Â Â Â Â Â Â Â To provide access to the surface impoundment for performing
routine inspection, maintenance, or other activities needed for normal
operations. Examples of such activities include those times when a worker needs
to open a port to sample the liquid in the surface impoundment, or when a
worker needs to open a hatch to maintain or repair equipment. Following
completion of the activity, the owner or operator must promptly replace the
cover and secure the closure device in the closed position, as applicable; or
ii)Â Â Â Â Â Â Â Â To remove accumulated sludge or other residues from the
bottom of surface impoundment; and
B)Â Â Â Â Â Â Â Opening of a safety device, as defined in Section 725.981, is
allowed at any time conditions require doing so to avoid an unsafe condition.
3)Â Â Â Â Â Â Â Â The owner or operator must inspect the floating membrane cover
in accordance with the following procedures:
A)Â Â Â Â Â Â Â The floating membrane cover and its closure devices must be
visually inspected by the owner or operator to check for defects that could
result in air pollutant emissions. Defects include, but are not limited to,
visible cracks, holes, or gaps in the cover section seams or between the
interface of the cover edge and its foundation mountings; broken, cracked, or
otherwise damaged seals or gaskets on closure devices; and broken or missing
hatches, access covers, caps, or other closure devices;
B)Â Â Â Â Â Â Â The owner or operator must perform an initial inspection of the
floating membrane cover and its closure devices on or before the date that the
surface impoundment becomes subject to this Section. Thereafter, the owner or
operator must perform the inspections at least once every year except for the
special conditions provided for in subsection (g);
C)Â Â Â Â Â Â Â In the event that a defect is detected, the owner or operator must
repair the defect in accordance with the requirements of subsection (f); and
D)Â Â Â Â Â Â Â The owner or operator must maintain a record of the inspection
in accordance with the requirements specified in Section 725.990(c).
d)Â Â Â Â Â Â Â Â The owner or operator that controls air pollutant emissions
from a surface impoundment using a cover vented to a control device must meet
the requirements specified in subsections (d)(1) through (d)(3).
1)Â Â Â Â Â Â Â Â The surface impoundment must be covered by a cover and vented
directly through a closed-vent system to a control device in accordance with
the following requirements:
A)Â Â Â Â Â Â Â The cover and its closure devices must be designed to form a
continuous barrier over the entire surface area of the liquid in the surface
impoundment;
B)Â Â Â Â Â Â Â Each opening in the cover not vented to the control device must
be equipped with a closure device. If the pressure in the vapor headspace
underneath the cover is less than atmospheric pressure when the control device
is operating, the closure devices must be designed to operate such that when
the closure device is secured in the closed position there are no visible
cracks, holes, gaps, or other open spaces in the closure device or between the
perimeter of the cover opening and the closure device. If the pressure in the
vapor headspace underneath the cover is equal to or greater than atmospheric
pressure when the control device is operating, the closure device must be
designed to operate with no detectable organic emissions using the procedure
specified in Section 725.984(d);
C)Â Â Â Â Â Â Â The cover and its closure devices must be made of suitable
materials that will minimize exposure of the hazardous waste to the atmosphere
to the extent practical and which will maintain the integrity of the cover and
closure devices throughout their intended service life. Factors to be
considered when selecting the materials of construction and designing the cover
and closure devices must include the following:Â the organic vapor
permeability; the effects of any contact with the liquid or its vapors managed
in the surface impoundment; the effects of outdoor exposure to wind, moisture,
and sunlight; and the operating practices used for the surface impoundment on
which the cover is installed; and
D)Â Â Â Â Â Â Â The closed-vent system and control device must be designed and
operated in accordance with the requirements of Section 725.988.
2)Â Â Â Â Â Â Â Â Whenever a hazardous waste is in the surface impoundment, the
cover must be installed with each closure device secured in the closed position
and the vapor headspace underneath the cover vented to the control device,
except as follows:
A)Â Â Â Â Â Â Â Venting to the control device is not required, and opening of
closure devices or removal of the cover is allowed at the following times:
i)Â Â Â Â Â Â Â Â Â To provide access to the surface impoundment for performing
routine inspection, maintenance, or other activities needed for normal
operations. Examples of such activities include those times when a worker needs
to open a port to sample liquid in the surface impoundment, or when a worker
needs to open a hatch to maintain or repair equipment. Following completion of
the activity, the owner or operator must promptly secure the closure device in
the closed position or reinstall the cover, as applicable, to the surface
impoundment; or
ii)Â Â Â Â Â Â Â Â To remove accumulated sludge or other residues from the
bottom of the surface impoundment; and
B)Â Â Â Â Â Â Â Opening of a safety device, as defined in Section 725.981, is
allowed at any time conditions require doing so to avoid an unsafe condition.
3)Â Â Â Â Â Â Â Â The owner or operator must inspect and monitor the air
emission control equipment in accordance with the following procedures:
A)Â Â Â Â Â Â Â The surface impoundment cover and its closure devices must be
visually inspected by the owner or operator to check for defects that could
result in air pollutant emissions. Defects include, but are not limited to,
visible cracks, holes, or gaps in the cover section seams or between the
interface of the cover edge and its foundation mountings; broken, cracked, or
otherwise damaged seals or gaskets on closure devices; and broken or missing
hatches, access covers, caps, or other closure devices;
B)Â Â Â Â Â Â Â The closed-vent system and control device must be inspected and
monitored by the owner or operator in accordance with the procedures specified
in Section 725.988;
C)Â Â Â Â Â Â Â The owner or operator must perform an initial inspection of the
air emission control equipment on or before the date that the surface
impoundment becomes subject to this Section. Thereafter, the owner or operator
must perform the inspections at least once every year except for the special
conditions provided for in subsection (g);
D)Â Â Â Â Â Â Â In the event that a defect is detected, the owner or operator must
repair the defect in accordance with the requirements of subsection (f); and
E)Â Â Â Â Â Â Â The owner or operator must maintain a record of the inspection
in accordance with the requirements specified in Section 725.990(c).
e)Â Â Â Â Â Â Â Â The owner or operator must transfer hazardous waste to a
surface impoundment subject to this Section in accordance with the following
requirements:
1)Â Â Â Â Â Â Â Â Transfer of hazardous waste, except as provided in subsection
(e)(2), to the surface impoundment from another surface impoundment subject to
this Section or from a tank subject to Section 725.985 must be conducted using
continuous hard-piping or another closed system that does not allow exposure of
the waste to the atmosphere. For the purpose of complying with this provision,
an individual drain system is considered to be a closed system when it meets
the requirements of subpart RR of 40 CFR 63 (National Emission Standards for
Individual Drain Systems), incorporated by reference in 35 Ill. Adm. Code
720.111(b); and
2)Â Â Â Â Â Â Â Â The requirements of subsection (e)(1) do not apply when
transferring a hazardous waste to the surface impoundment under any of the following
conditions:
A)Â Â Â Â Â Â Â The hazardous waste meets the average VO concentration
conditions specified in Section 725.983(c)(1) at the point of waste origination;
B)Â Â Â Â Â Â Â The hazardous waste has been treated by an organic destruction
or removal process to meet the requirements in Section 725.983(c)(2); or
C)Â Â Â Â Â Â Â The hazardous waste meets the requirements of Section
725.983(c)(4).
f)Â Â Â Â Â Â Â Â The owner or operator must repair each defect detected during
an inspection performed in accordance with the requirements of subsection
(c)(3) or (d)(3) as follows:
1)Â Â Â Â Â Â Â Â The owner or operator must make first efforts at repair of the
defect no later than five calendar days after detection, and repair must be
completed as soon as possible but no later than 45 calendar days after detection
except as provided in subsection (f)(2); and
2)Â Â Â Â Â Â Â Â Repair of a defect may be delayed beyond 45 calendar days if
the owner or operator determines that repair of the defect requires emptying or
temporary removal from service of the surface impoundment and no alternative
capacity is available at the site to accept the hazardous waste normally
managed in the surface impoundment. In this case, the owner or operator must
repair the defect the next time the process or unit that is generating the
hazardous waste managed in the tank stops operation. Repair of the defect must
be completed before the process or unit resumes operation.
g)Â Â Â Â Â Â Â Â Following the initial inspection and monitoring of the cover,
as required by the applicable provisions of this Subpart CC, subsequent
inspection and monitoring may be performed at intervals longer than one year in
the case when inspecting or monitoring the cover would expose a worker to
dangerous, hazardous, or other unsafe conditions. In this case, the owner or
operator may designate the cover as an "unsafe to inspect and monitor
cover" and comply with all of the following requirements:
1)Â Â Â Â Â Â Â Â Prepare a written explanation for the cover stating the
reasons why the cover is unsafe to visually inspect or to monitor, if required;
and
2)Â Â Â Â Â Â Â Â Develop and implement a written plan and schedule to inspect
and monitor the cover using the procedures specified in the applicable Section
of this Subpart CC as frequently as practicable during those times when a
worker can safely access the cover.