35 Ill. Adm. Code 727.210
Closure
Section 727.210Â Closure
a)Â Â Â Â Â Â Â Â Applicability
of This Section. This Section applies to the facility owner or operator of a
facility that treats or stores hazardous waste under a RCRA standardized permit
pursuant to Subpart J of 35 Ill. Adm. Code 703, except as provided in Section
727.100(a)(2).
BOARD NOTE:Â Subsection (a) is
derived from 40 CFR 267.110 (2017).
b)Â Â Â Â Â Â Â Â Required
General Standards When Operations Cease. The facility owner or operator must
close the storage and treatment units in a manner that fulfills the following
conditions:
1)Â Â Â Â Â Â Â Â It
minimizes the need for further maintenance;
2)Â Â Â Â Â Â Â Â It
controls, minimizes, or eliminates, to the extent necessary to protect human
health and the environment, the post-closure escape of hazardous waste,
hazardous constituents, leachate, contaminated run-off, or hazardous waste decomposition
products to the ground, to surface waters, or to the atmosphere; and
3)Â Â Â Â Â Â Â Â It
meets the closure requirements of this Section and the requirements of Sections
727.270(g), 727.290(l), and 727.900(i). If the facility owner or operator
determines that, when applicable, the closure requirements of Section
727.290(l) (tanks) or 727.900(i) (containment buildings) cannot be met, then the
owner or operator must close the unit in accordance with the requirements that
apply to landfills (35 Ill. Adm. Code 724.410). In addition, for the purposes
of post-closure and financial responsibility, such a tank system or containment
building is then considered to be a landfill, and the owner or operator must
apply for a post-closure care permit in accordance with 35 Ill. Adm. Code 702
and 703.
BOARD NOTE:Â Subsection (b) is
derived from 40 CFR 267.111 (2017).
c)Â Â Â Â Â Â Â Â Closure
Procedures
1)Â Â Â Â Â Â Â Â To
close a facility, the facility owner or operator must follow its approved
closure plan, and follow notification requirements.
A)Â Â Â Â Â Â Â The
facility owner or operator must submit its closure plan at the time it submits
its Notice of Intent to operate under a RCRA standardized permit. Final
issuance of the RCRA standardized permit constitutes approval of the closure
plan, and the plan becomes a condition of the RCRA standardized permit.
B)Â Â Â Â Â Â Â The
Agency's approval of the plan must ensure that the approved plan is consistent
with Sections 727.210(b) through (f), 727.270(g), 727.290(l), and 727.900(i).
2)Â Â Â Â Â Â Â Â Content
of Closure Plan. The closure plan must identify steps necessary to perform
partial or final closure of the facility. The closure plan must include at
least the following minimum information:
A)Â Â Â Â Â Â Â A
description of how each hazardous waste management unit at the facility subject
to this Section will be closed following the requirements of Section
727.210(b);
B)Â Â Â Â Â Â Â A
description of how final closure of the facility will be conducted in
accordance with Section 727.210(b). The description must identify the maximum
extent of the operations that will be unclosed during the active life of the
facility;
C)Â Â Â Â Â Â Â An
estimate of the maximum inventory of hazardous wastes ever on site during the
active life of the facility and a detailed description of the methods that the
facility owner or operator will use during partial or final closure, such as
methods for removing, transporting, treating, storing, or disposing of all
hazardous wastes, and identification of the types of off-site hazardous waste
management units to be used, if applicable;
D)Â Â Â Â Â Â Â A detailed
description of the steps needed to remove or decontaminate all hazardous waste
residues and contaminated containment system components, equipment, structures,
and soils during partial or final closure. These might include procedures for
cleaning equipment and removing contaminated soils, methods for sampling and
testing surrounding soils, and criteria for determining the extent of
decontamination required to satisfy the closure performance standard;
E)Â Â Â Â Â Â Â A
detailed description of other activities necessary during the closure period to
ensure that partial or final closure satisfies the closure performance
standards;
F)Â Â Â Â Â Â Â Â A
schedule for closure of each hazardous waste management unit, and for final
closure of the facility. The schedule must include, at a minimum, the total
time required to close each hazardous waste management unit and the time
required for intervening closure activities that allow tracking of progress of
partial or final closure; and
G)Â Â Â Â Â Â Â For
facilities that use trust funds to establish financial assurance pursuant to
Section 727.240(d) and that are expected to close prior to the expiration of
the permit, an estimate of the expected year of final closure.
3)Â Â Â Â Â Â Â Â The
facility owner or operator may submit a written notification to the Agency for
a permit modification to amend the closure plan at any time prior to the
notification of partial or final closure of the facility, following the
applicable procedures in 35 Ill. Adm. Code 705.304.
A)Â Â Â Â Â Â Â Events
leading to a change in the closure plan, and therefore requiring a
modification, may include the following:
i)Â Â Â Â Â Â Â Â Â A
change in the operating plan or facility design;
ii)Â Â Â Â Â Â Â Â A
change in the expected year of closure, if applicable; or
iii)Â Â Â Â Â Â Â In
conducting partial or final closure activities, an unexpected event requiring a
modification of the approved closure plan.
B)Â Â Â Â Â Â Â The
written notification or request must include a copy of the amended closure plan
for review or approval by the Agency. The Agency must approve, disapprove, or
modify this amended plan in accordance with the procedures in 35 Ill.
Adm. Code 703.353 and 705.304.
4)Â Â Â Â Â Â Â Â Notification
before Final Closure
A)Â Â Â Â Â Â Â The
facility owner or operator must notify the Agency in writing at least 45 days
before the date that it expects to begin final closure of a treatment or
storage tank, container storage area, or containment building.
B)Â Â Â Â Â Â Â The
date when the owner or operator "expects to begin closure" must be no
later than 30 days after the date that any hazardous waste management unit
receives the known final volume of hazardous wastes.
C)Â Â Â Â Â Â Â If the
facility's permit is terminated, or if the facility owner or operator is
otherwise ordered, by a federal judicial decree or final order pursuant to
section 3008 of RCRA (42 USC 6928), to cease receiving hazardous wastes or to
close, then the requirements of this subsection (c)(4) do not apply. However,
the owner or operator must close the facility following the deadlines
established in subsection (f).
BOARD NOTE:Â Subsection (c) is
derived from 40 CFR 267.112 (2017).
d)Â Â Â Â Â Â Â Â Opportunity for Public Comment on the Plan
1)Â Â Â Â Â Â Â Â The
Agency must provide the facility owner or operator and the public, when the
draft RCRA standardized permit is public noticed, the opportunity to submit
written comments on the plan and to the draft permit as allowed by 35 Ill. Adm.
Code 705.303(b). The Agency must also, in response to a request or at its own
discretion, hold a public hearing whenever it determines that such a hearing
might clarify one or more issues concerning the closure plan, and the permit.
2)Â Â Â Â Â Â Â Â The
Agency must give public notice of the hearing 30 days before it occurs. Public
notice of the hearing may be given at the same time as notice of the
opportunity for the public to submit written comments, and the two notices may
be combined.
BOARD NOTE:Â Subsection (d) is
derived from 40 CFR 267.113 (2017).
e)Â Â Â Â Â Â Â Â This
subsection (e) corresponds with 40 CFR 267.114, which USEPA has marked
"Reserved". This statement maintains structural consistency with the
corresponding federal rules.
f)Â Â Â Â Â Â Â Â Time Allowed
for Closure
1)Â Â Â Â Â Â Â Â Within
90 days after the final volume of hazardous waste is sent to a unit, the
facility owner or operator must treat or remove all hazardous wastes from the
unit following the approved closure plan.
2)Â Â Â Â Â Â Â Â The
facility owner or operator must complete final closure activities in accordance
with the approved closure plan within 180 days after the final volume of
hazardous wastes is sent to the unit. The Agency may approve an extension of
180 days to the closure period if the owner or operator complies with all
applicable requirements for requesting a modification to the permit and
demonstrates that the conditions of subsections (f)(2)(A) and (f)(2)(B) are
fulfilled subject to the limitation of subsection (f)(2)(C):
A)Â Â Â Â Â Â Â The
final closure activities will take longer than 180 days to complete due to
circumstances beyond the control of the owner or operator, excluding groundwater
contamination;
B)Â Â Â Â Â Â Â The
facility owner or operator has taken and will continue to take all steps to
prevent threats to human health and the environment from the unclosed, but not
operating hazardous waste management unit or facility, including compliance
with all applicable permit requirements; and
C)Â Â Â Â Â Â Â The owner
or operator must make the demonstration of subsections (f)(2)(A) and (f)(2)(B)
at least 30 days prior to the expiration of the initial 180-day period.
3)Â Â Â Â Â Â Â Â Nothing
in this subsection (f) precludes the facility owner or operator from removing
hazardous wastes and decontaminating or dismantling equipment in accordance
with the approved final closure plan at any time before or after notification
of final closure.
BOARD NOTE:Â Subsection (f) is
derived from 40 CFR 267.115 (2017).
g)Â Â Â Â Â Â Â Â Disposition
of Contaminated Equipment, Structure, and Soils. The facility owner or
operator must properly dispose of or decontaminate all contaminated equipment,
structures, and soils during the partial and final closure periods. By
removing any hazardous wastes or hazardous constituents during partial and
final closure, the owner or operator may become a generator of hazardous waste
and must handle that waste following all applicable requirements of 35 Ill.
Adm. Code 722.
BOARD NOTE:Â Subsection (g) is
derived from 40 CFR 267.116 (2017).
h)Â Â Â Â Â Â Â Â Certification
of Closure. Within 60 days after the completion of final closure of each unit
under a RCRA standardized permit pursuant to Subpart J of 35 Ill. Adm. Code
705, the facility owner or operator must submit to the Agency, by registered
mail, a certification that each hazardous waste management unit or facility, as
applicable, has been closed following the specifications in the closure plan.Â
Both the owner or operator and an independent registered professional engineer
must sign the certification. The owner or operator must furnish documentation
supporting the independent registered professional engineer's certification to
the Agency upon request until the Agency releases the owner or operator from
the financial assurance requirements for closure pursuant to Section
727.240(d)(10).
BOARD NOTE:Â Subsection (h) is