35 Ill. Adm. Code 730.164
Corrective Action for Wells in the Area of Review
Section 730
Section 730.164 Corrective
Action for Wells in the Area of Review
For the purposes of a Class I
hazardous waste injection well, this Section applies instead of 35 Ill. Adm.
Code 704.193 and Section 730.107.
a) The owner or operator of a Class I hazardous waste injection well
must, as part of the permit application, submit a plan to the Agency outlining
the protocol used to accomplish both of the following:
1) Identify all wells penetrating the confining zone or injection
zone within the area of review; and
2) Determine whether wells are adequately completed or plugged.
b) The owner or operator of a Class I hazardous waste injection well
must identify the location of all wells within the area of review that
penetrate the injection zone or the confining zone and must submit both of the
following, as required in Section 730.170(a):
1) A tabulation of all wells within the area of review that
penetrate the injection zone or the confining zone; and
2) A description of each well or type of well and any records of
its plugging or completion.
c) For wells that the Agency determines are improperly plugged,
completed, or abandoned, or for which plugging or completion information is
unavailable, the applicant must also submit a plan consisting of such steps or
modification as are necessary to prevent movement of fluids into or between
USDWs. Where the plan is adequate, the Agency must incorporate it into the
permit as a condition. Where the Agency's review of an application indicates
the permittee's plan is inadequate (based at a minimum on the factors in
subsection (e)), the Agency must do the appropriate of the following:
1) It must require the applicant to revise the plan;
2) It must prescribe a plan for corrective action as a condition
of the permit; or
3) It must deny the application.
d) Requirements
1) Existing Injection Wells. Any permit issued for an existing
Class I hazardous waste injection well requiring corrective action other than
pressure limitations must include a compliance schedule pursuant to 35 Ill.
Adm. Code 702.162 requiring any corrective action accepted or prescribed pursuant
to subsection (c). Any such compliance schedule must provide for compliance no
later than two years following issuance of the permit and must require
observance of appropriate pressure limitations pursuant to subsection (d)(3)
until all other corrective action measures have been implemented.
2) New Injection Wells. No owner or operator of a new Class I
hazardous waste injection well may begin injection until all corrective actions
required pursuant to this Section have been taken.
3) The Agency may require pressure limitations instead of
plugging. If pressure limitations are used instead of plugging, the Agency must
require as a permit condition that injection pressure be limited so that
pressure in the injection zone at the site of any improperly completed or
abandoned well within the area of review would not be sufficient to drive
fluids into or between USDWs. This pressure limitation must satisfy the
corrective action requirements. Alternatively, such injection pressure
limitation may be made part of a compliance schedule pursuant to 35 Ill. Adm.
Code 702.162 and may be required to be maintained until all other required
corrective actions have been implemented.
e) The Agency must consider the following criteria and factors in
determining the adequacy of corrective action proposed by the applicant pursuant
to subsection (c) and in determining the additional steps needed to prevent
fluid movement into and between USDWs:
1) The nature and volume of injected fluid;
2) The nature of native fluids or byproducts of injection;
3) Geology;
4) Hydrology;
5) The history of the injection operation;
6) Any completion and plugging records;
7) The closure procedures in effect at the time the well was
closed;
8) Any hydraulic connections with USDWs;
9) The reliability of the procedures used to identify abandoned
wells; and
10) Any other factors that might affect the movement of fluids
into or between USDWs.
BOARD NOTE:
Derived from 40 CFR 146.64 (2017).