35 Ill. Adm. Code 730.192
Injection Well Plugging
Section 730.192 Injection Well Plugging
a) Prior
to the well plugging, the owner or operator must flush each Class VI injection
well with a buffer fluid, determine bottom-hole reservoir pressure, and perform
a final external mechanical integrity test.
b) Well
plugging plan. The owner or operator of a Class VI injection well must
prepare, maintain, and comply with a well plugging plan that is acceptable to
the Agency. The requirement to maintain and implement an approved well
plugging plan is directly enforceable regardless of whether the requirement is
a condition of the permit. The owner or operator must submit the well plugging
plan as part of the permit application, and the well plugging plan must include
the following information:
1) Appropriate
tests or measures for determining bottomhole reservoir pressure;
2) Appropriate
testing methods to ensure external mechanical integrity, as specified in
Section 730.189;
3) The type and number of plugs
to be used;
4) The
placement of each plug, including the elevation of the top and bottom of each
plug;
5) The
type, grade, and quantity of material to be used in plugging. The material
must be compatible with the carbon dioxide stream; and
6) The method of placement
of the plugs.
c) Notice
of intent to plug. The owner or operator must notify the Agency in writing,
and USEPA electronically pursuant to Section 730.191(e), at least 60 days
before beginning the plugging of a well. The owner or operator must also
provide the revised well plugging plan at the time of this notice if any
changes have been made to the original well plugging plan. The Agency must
allow for a shorter notice period if the Agency determines that the shorter
notice period is adequate to complete Agency review of the well plugging plan
or that well plugging must occur more promptly. The Agency must approve any
amendments to the injection well plugging plan and incorporate the amendments
into the permit, and the incorporation of the amendments into the permit is
subject to the permit modification requirements set forth in 35 Ill. Adm. Code
704.262 or 704.264, as appropriate.
d) Plugging
report. Within 60 days after plugging, the owner or operator must submit a
plugging report to the Agency and electronically to USEPA pursuant to Section
730.191(e). The plugging report must be certified as accurate by the owner or
operator and by the person who performed the plugging operation (if other than
the owner or operator). The owner or operator must retain the well plugging
report for 10 years following site closure.
BOARD NOTE: This Section
corresponds with 40 CFR 146.92 (2011).