35 Ill. Adm. Code 740.450
Remedial Action Plan
Section 740
Section 740.450Â Remedial
Action Plan
If the approved remediation
objectives for any regulated substance
of concern
established under
Sections 740.440 and 740.445 of this Part
are less than the levels at the
remediation
site prior to any remedial action, the RA shall prepare a
Remedial Action Plan. The plan shall describe the
proposed
remedy and
evaluate its ability and effectiveness to achieve the remediation objectives
approved for the
remediation
site
[415 ILCS 5/58.6(d)], including but
not limited to:
a)        Executive summary. This chapter shall identify the objectives
of the Remedial Action Plan and the technical approach utilized to meet such
objectives. At a minimum, this chapter shall include the following elements:
1)Â Â Â Â Â Â Â Â The major components (e.g., treatment, containment, removal
actions) of the Remedial Action Plan;
2)Â Â Â Â Â Â Â Â The scope of the problems to be addressed by the proposed
remedial action(s) including the specific contaminants of concern and the
physical area to be addressed by the Remedial Action Plan; and
3)Â Â Â Â Â Â Â Â Schedule of activities with estimated dates of completion
through the recording of the No Further Remediation Letter or execution of an
IDOT Memorandum of Agreement (MOA) under Section 740.621 of this Part or a LUC
MOA under Section 740.622 of this Part;
b)Â Â Â Â Â Â Â Â Statement of remediation objectives or reference to
Remediation Objectives Report;
c)        Remedial technologies selected. This chapter shall describe
how each major remedial technology identified in the Remedial Action Plan fits
into the overall strategy for addressing the recognized environmental
conditions at the remediation site, including but not limited to:
1)Â Â Â Â Â Â Â Â Feasibility of implementation;
2)Â Â Â Â Â Â Â Â Whether the technologies will perform satisfactorily and
reliably until the remediation objectives are achieved;
3)Â Â Â Â Â Â Â Â Whether remediation objectives will be achieved within a
reasonable period of time; and
4)Â Â Â Â Â Â Â Â If applicable, a request for a soil management zone under
Section 740.535 of this Part describing the steps that will be taken to ensure
compliance with the requirements for soil management zones;
d)        Confirmation sampling plan. This chapter shall describe how
the effectiveness of the remedial action will be measured. At a minimum, a
site-specific sampling plan and quality assurance project plan must be prepared
in accordance with the provisions set forth in Section 740.415(d) of this Part;
e)Â Â Â Â Â Â Â Â Current and post-remediation use of the property;
f)Â Â Â Â Â Â Â Â Applicable engineered barriers, institutional controls, and
groundwater monitoring. This chapter shall describe any such controls selected
or relied upon in determining or achieving remediation objectives, including
long-term reliability, operating and maintenance plans, and monitoring
procedures;
g)        Appendices. References and other informational sources should
be incorporated into the appendices; and
h)Â Â Â Â Â Â Â Â Licensed Professional Engineer affirmation in accordance with
Section 740.410 of this Part.