35 Ill. Adm. Code 740.810
Engineered Barriers and Institutional Controls
Section 740
Section 740.810Â Engineered
Barriers and Institutional Controls
a)Â Â Â Â Â Â Â Â The RA or any subsequent transferee of a remediation site
subject to this Subpart H shall arrange with an LPE for an inspection of the
remediation site within 120 days before every fifth anniversary of the date of
issuance of the NFR Letter. The purpose of the inspection shall be to determine
whether the effectiveness of all engineered barriers and institutional controls
required by the Remedial Action Plan and the NFR Letter has been maintained.
1)Â Â Â Â Â Â Â Â The LPE shall prepare a report on the results of the inspection,
itemizing each engineered barrier and institutional control and whether or not
the effectiveness of each engineered barrier and institutional control has been
maintained. If the effectiveness of any engineered barrier or institutional
control has been compromised, the LPE shall describe the nature of the defects.
2)Â Â Â Â Â Â Â Â The LPE responsible for the site inspection and preparation of
the report shall affirm by original signature as follows:
"I attest that the inspection of the remediation site to
confirm the effectiveness of the engineered barriers and institutional controls
required by the Remedial Action Plan and the NFR Letter was performed under my
direction and that:
This document and all attachments were prepared under my
direction or reviewed by me;
To the best of my knowledge and belief, the work and
conclusions described in this report are in accordance with the requirements of
35 Ill. Adm. Code 740 and 742, the site's Remedial Action Plan and NFR Letter,
and generally accepted engineering practices; and
The information presented is accurate and complete."
2)Â Â Â Â Â Â Â Â The LPE's report shall be submitted to the Agency no later
than every fifth anniversary of the date of issuance of the NFR Letter.
b)Â Â Â Â Â Â Â Â In addition to any other remedies that may be available, the
Agency may void the NFR Letter in accordance with Section 740.625 if:
1)Â Â Â Â Â Â Â Â An LPE's report is not submitted to the Agency by every fifth
anniversary of the date of issuance of the NFR Letter; or
2)Â Â Â Â Â Â Â Â The LPE's report indicates that the effectiveness of any
engineered barrier or institutional control has not been maintained.
c)Â Â Â Â Â Â Â Â The requirements of this Section shall not apply to a
remediation site if no engineered barriers or institutional controls were
required under the Remedial Action Plan and the NFR Letter, or if the
remediation site is no longer used as a school site.
d)Â Â Â Â Â Â Â Â If the site is transferred to a third-party, the transferor of
the site shall notify the Agency of such changes within 30 days of the
completion of the transfer.