35 Ill. Adm. Code 742.1210
Building Control Technology Requirements
Section 742.1210Â Building Control Technology
Requirements
a)Â Â Â Â Â Â Â Â Natural
attenuation, access controls, and point of use treatment shall not be
considered building control technologies.
b)Â Â Â Â Â Â Â Â For
purposes of determining compliance with remediation objectives under Tier 1,
building control technologies are not recognized.
c)Â Â Â Â Â Â Â Â The
following building control technologies are recognized for purposes of pathway
exclusion under Section 742.312.
1)Â Â Â Â Â Â Â Â Sub-slab
depressurization (SSD) systems meeting the following requirements:
A)Â Â Â Â Â Â Â A
suction pit is installed that is at least two cubic feet and extends at least
6 inches below the slab (larger suction pits may be excavated as needed to
achieve the performance criteria in subsection (c)(1)(B));
B)Â Â Â Â Â Â Â A PVC
pipe of at least 3 inches in diameter extends from the suction pit to the
intake side of an in-line fan capable of achieving a static vacuum of at least
0.25 inches water column (wc) at the suction point and measureable vacuum at
the farthest edges of the area served by the suction pit under worst case
conditions (all exhaust fans and heating systems running, during cold weather)
as determined by a differential pressure reading of at least -0.003 inches wc
below the slab or visible downward flow of air at test holes using chemical or
smoke sticks;
C)Â Â Â Â Â Â Â All
visible cracks and joints in the slab (including the place where the pipe exits
the slab) and foundation walls are sealed;
D)Â Â Â Â Â Â Â The
pipe exhausts outside the building at least 10 feet above ground and at least
10 feet from any door or window; and
E)Â Â Â Â Â Â Â Additional
suction pits meeting the requirements of subsection (c)(1)(A) shall be
installed as necessary to achieve measureable vacuum below the slab in all
areas, including in any area where subsurface or foundation conditions (e.g., a
sub-slab grade beam) prevent adequate suction field extension.
2)Â Â Â Â Â Â Â Â Sub-membrane
depressurization (SMD) systems meeting the following requirements:
A)Â Â Â Â Â Â Â A
non-woven geotextile is installed on the exposed earthen material;
B)Â Â Â Â Â Â Â A
cross-laminated polyethylene membrane liner at least 0.10 mm (or 4 mil) thick
is placed over the geotextile and sealed to foundation walls using a low
volatile adhesive that is recommended by the liner manufacturer (e.g., acrylic
latex adhesive);
C)Â Â Â Â Â Â Â A 3
inch diameter PVC pipe extends from a hole cut in the liner to the intake side
of an in-line fan capable of achieving a static vacuum of at least 0.25 inches
water column (wc) at the riser pipe and measureable vacuum at the farthest
edges of the liner under worst case conditions (all exhaust fans running during
cold weather) as determined by a differential pressure reading of at least
-0.003 inches wc below the liner or visible downward flow of air in test holes
using chemical or smoke sticks;
D)Â Â Â Â Â Â Â The
pipe is sealed to the liner;
E)Â Â Â Â Â Â Â The
pipe exhausts outside the building at least 10 feet above ground and at least
10 feet from any door or window; and
F)Â Â Â Â Â Â Â Â No
leaks based on smoke stick tests along the entire perimeter of the liner (i.e.,
at all sealed edges) with the fan running. Where leaks are identified,
appropriate repairs are undertaken and smoke stick testing repeated until no
leaks are detected.
3)Â Â Â Â Â Â Â Â Membrane
barrier systems when placed below concrete slabs meeting the following
requirements:
A)Â Â Â Â Â Â Â The
membrane is impermeable to volatile chemicals and is not less than 1.5 mm (or
60 mil) thick;
B)Â Â Â Â Â Â Â The
membrane is sealed to foundation walls and any penetrating pipes according to
membrane manufacturer/installer recommendations;
C)Â Â Â Â Â Â Â The
membrane is installed in accordance with the manufacturer's requirements and by
an applicator trained and approved by the manufacturer;
D)Â Â Â Â Â Â Â A
smoke test of the membrane system (where smoke is injected below the installed
liner prior to slab installation), in accordance with the manufacturer's
requirements, is performed to ensure no leaks exist. Where leaks are
identified, appropriate repairs are undertaken and smoke testing repeated until
no leaks are detected;
E)Â Â Â Â Â Â Â The
membrane is puncture resistant to slab installation construction activities and
protected by sand layers or geotextiles as recommended by the manufacturer; and
F)Â Â Â Â Â Â Â Â Construction
activities following membrane installation do not damage, puncture or tear the
membrane or otherwise compromise its ability to prevent the migration of
volatile chemicals.
4)Â Â Â Â Â Â Â Â Vented
raised floors meeting the following requirements:
A)Â Â Â Â Â Â Â An
interconnected void system below the slab sufficient to allow free movement of
air and communication of negative pressures to all points below the slab;
B)Â Â Â Â Â Â Â Sealing
of all construction joints, open cracks, and penetrations through the slab
(e.g., for utilities and riser pipes) with a low volatile caulk; and
C)Â Â Â Â Â Â Â At
least one 3 inch diameter riser pipe venting to the atmosphere above the roof
line (at least 10 feet from any doors or windows) for each 5000 square feet of
membrane area, with the capability of converting passively vented floor systems
to actively vented or SSD systems meeting the performance requirements of subsection
(c)(1).