a) Purpose
The operator shall conduct a hydrogeologic investigation to
develop hydrogeologic information for the following uses:
1) Provide information to perform a groundwater impact
assessment; and
2) Provide information to establish a groundwater monitoring system.
b) General Requirements
1) The investigation shall be conducted in a minimum of three
phases prior to submission of any application to the Agency for a permit to
develop and operate a landfill facility.
2) The study area shall consist of the entire area occupied by
the facility and any adjacent related areas, if necessary for the purposes of
the hydrogeological investigation set forth in subsection (a).
3) All borings shall be sampled continuously at all recognizable
points of geologic variation, except that where continuous sampling is
impossible or where non-continuous sampling can provide equivalent information,
samples shall be obtained at intervals no greater than 1.52 meters (five feet)
in homogeneous strata.
c) Minimum Requirements for a Phase I Investigation
1) The operator shall conduct a Phase I Investigation to develop
the following information:
A) Climatic aspects of the study area;
B) The regional and study area geologic setting, including a
description of the geomorphology and stratigraphy of the area;
C) The regional groundwater regime including water table depths
and aquifer characteristics; and
D) Information for the purpose of designing a Phase II
Hydrogeologic Investigation.
2) Specific Requirements
A) The regional hydrogeologic setting of the unit shall be
established by using material available from all possible sources, including,
but not limited to, the Illinois Scientific Surveys, the Agency, other State
and Federal organizations, water well drilling logs, and previous
investigations.
B) A minimum of one continuously sampled boring shall be drilled
on the site, as close as feasible to the geographic center, to determine if the
available regional hydrogeologic setting information is accurate and to
characterize the site-specific hydrogeology to the extent specified by this
phase of the investigation. The boring shall extend at least 15.2 meters (50
feet) below the bottom of the uppermost aquifer or through the full depth of
the confining layer below the uppermost aquifer, or to bedrock, if the bedrock
is below the upper most aquifer, whichever elevation is higher. The locations
of any additional borings, required under this subsection, may be chosen by the
investigator, but shall be sampled continuously.
d) Minimum Requirements for a Phase II Investigation
1) Information to be developed
Using the information developed in the Phase I survey, a
Phase II study shall be conducted to collect the site-specific information
listed below as needed to augment data collected during the Phase I
investigation and to prepare for the Phase III investigation:
A) Structural characteristics and distribution of underlying
strata including bedrock;
B) Chemical and physical properties including, but not limited to,
lithology, mineralogy, and hydraulic characteristics of underlying strata
including those below the uppermost aquifer;
C) Soil characterisitics, including soil types, distribution,
geochemical and geophysical characteristics;
D) The hydraulic conductivities of the uppermost aquifer and all
strata above it;
E) The vertical extent of the uppermost aquifer;
F) The direction and rate of groundwater flow.
2) Specific Requirements
A) One boring shall be located as close as feasible to the
topographical high point, and another shall be located as close as feasible to
the topographical low point of the study area.
B) At least one boring shall be at or near each corner of the
site. Where the property is irregularly shaped the borings shall be located
near the boundary in a pattern and spacing necessary to obtain data over the
entire study area.
C) Additional borings may be located at intermediate points at
locations and spacings necessary to establish the continuity of the
stratigraphic units.
D) Piezometers and groundwater monitoring wells shall be
established to determine the direction and flow characteristics of the groundwater
in all strata and extending down to the bottom of the uppermost aquifer. Groundwater
samples taken from such monitoring wells shall be used to develop preliminary
information needed for establishing background concentrations in accordance
with subsection (e)(1)(G).
E) Other methods may be utilized to confirm or accumulate
additional information. Such methods may be used only as a supplement to, not
in lieu of, site-specific boring information. Other methods include, but are
not limited to, geophysical well logs, geophysical surveys, aerial photography,
age dating, and test pits.
e) Minimum Standards for a Phase III Investigation
1) Using the information developed during the Phase I and Phase
II Investigations, the operator shall conduct a Phase III Investigation. This
investigation shall be conducted to collect or augment the site-specific
information needed to carry out the following:
A) Verification and reconciliation of the information collected in
the Phase I and II investigations;
B) Characterization of potential pathways for contaminant
migration;
C) Correlation of stratigraphic units between borings;
D) Continuity of petrographic features including, but not limited
to, sorting, grain size distribution, cementation and hydraulic conductivity;
E) Identification of zones of potentially high hydraulic
conductivity;
F) Identification of the confining layer, if present;
G) Concentrations of chemical constituents present in the
groundwater below the unit, down to the bottom of the uppermost aquifer, using
a broad range of chemical analysis and detection procedures such as, gas
chromatographic and mass spectrometric scanning. However, additional
measurements and procedures shall be carried out to establish background
concentrations, in accordance with Section 811.320(d), for:
i) Any constituent for which there is a standard at 35 Ill. Adm.
Code 620 established by the Board and which is expected to appear in the
leachate; and
ii) Any other constituent for which there is no Board-established
standard, but which is expected to appear in the leachate at concentrations
above PQL, as defined in Section 811.319(a)(4)(A) for that constituent;
H) Characterization of the seasonal and temporal, naturally and artificially
induced, variations in groundwater quality and groundwater flow; and
I) Identification of unusual or unpredicted geologic features,
including: fault zones, fracture traces, facies changes, solution channels,
buried stream deposits, cross cutting structures and other geologic features
that may affect the ability of the operator to monitor the groundwater or
predict the impact of the disposal facility on groundwater.
2) In addition to the specific requirements applicable to Phase I
and II investigations, the operator shall collect information needed to meet
the minimum standards of a Phase III investigation by using methods that may
include, but not limited to excavation of test pits, additional borings located
at intermediate points between boreholes placed during Phase I and II
investigations, placement of piezometers and monitoring wells, and institution
of procedures for sampling and analysis.
f) The operator may conduct the hydrogeologic investigation in
any number of alternative ways provided that the necessary information is
collected in a systematic sequence consisting of at least three phases that is
equal to or superior to the investigation procedures of this Section.