35 Ill. Adm. Code 811.326
Implementation of the corrective action program at MSWLF Units
Section 811
Section 811.326
Implementation of the corrective action program at MSWLF Units
a) Based on the schedule established pursuant to Section
811.325(d) for initiation and completion of corrective action, the owner or
operator must fulfill the following requirements:
1) It must establish and implement a corrective action
groundwater monitoring program that fulfills the following requirements:
A) At a minimum, the program must meet the requirements of an
assessment monitoring program pursuant to Section 811.319(b);
B) The program must indicate the effectiveness of the remedy; and
C) The program must demonstrate compliance with groundwater
protection standards pursuant to subsection (e).
2) It must implement the remedy selected pursuant to Section
811.325.
3) It must take any interim measures necessary to ensure the adequate
protection of human health and the environment. The interim measures should,
to the greatest extent practicable, be consistent with the objectives of and
contribute to the performance of any remedy that may be required pursuant to
Section 811.325. The owner or operator must consider the following factors in
determining whether interim measures are necessary:
A) The time required to develop and implement a final remedy;
B) Any actual or potential exposure of nearby populations or
environmental receptors to hazardous constituents;
C) Any actual or potential contamination of drinking water
supplies or sensitive ecosystems;
D) Any further degradation of the groundwater that may occur if
remedial action is not initiated expeditiously;
E) The weather conditions that may cause hazardous constituents to
migrate or be released;
F) Any risks of fire or explosion, or potential for exposure to
hazardous constituents as a result of an accident or failure of a container or
handling system; and
G) Any other situations that may pose threats to human health and
the environment.
b) If an owner or operator determines, based on information
developed after implementation of the remedy has begun or other information,
that compliance with requirements of Section 811.325(b) are not being achieved
through the remedy selected, the owner or operator must fulfill the following
requirements:
1) It must implement other methods or techniques that could
practicably achieve compliance with the requirements, unless the owner or
operator makes the determination pursuant to subsection (c).
2) It must submit to the Agency, prior to implementing any
alternative methods pursuant to subsection (b)(1), an application for a
significant modification to the permit describing the alternative methods or
techniques and how they meet the standards of Section 811.325(b).
c) If the owner or operator determines that compliance with the
requirements of Section 811.325(b) cannot be practically achieved with any
currently available methods, the owner or operator must fulfill the following
requirements:
1) It must obtain the certification of a qualified groundwater
scientist or a determination by the Agency that compliance with requirements pursuant
to Section 811.325(b) cannot be practically achieved with any currently
available methods.
2) It must implement alternative measures to control exposure of
humans or the environment to residual contamination, as necessary to adequately
protect human health and the environment.
3) It must implement alternative measures for control of the
sources of contamination, or for removal or decontamination of equipment,
units, devices, or structures that fulfill the following requirements:
A) The measures are technically practicable; and
B) The measures are consistent with the overall objective of the
remedy.
4) It must submit to the Agency, prior to implementing the
alternative measures in accordance with subsection (c), an application for a
significant modification to the permit justifying the alternative measures.
5) For purposes of this Section, a "qualified groundwater
scientist" is a scientist or an engineer who has received a baccalaureate
or postgraduate degree in the natural sciences or engineering and has
sufficient training and experience in groundwater hydrology and related fields
as may be demonstrated by state registration, professional certifications, or
completion of accredited university programs that enable that individual to
make sound professional judgments regarding groundwater monitoring, contaminant
fate and transport, and corrective action.
d) All solid wastes that are managed pursuant to Section 811.325
or subsection (a)(3) must be managed by the owner or operator in a manner that
fulfills the following requirements:
1) It adequately protects human health and the environment; and
2) It complies with applicable requirements of this Part.
e) Remedies selected pursuant to Section 811.325 must be
considered complete when the following requirements are fulfilled:
1) The owner or operator complies with the groundwater quality
standards established pursuant to Section 811.320 at all points within the
plume of contamination that lie beyond the zone of attenuation established
pursuant to Section 811.320;
2) Compliance with the groundwater quality standards established pursuant
to Section 811.320 has been achieved by demonstrating that concentrations of
the constituents monitored under the assessment monitoring program pursuant to
Section 811.319(b) have not exceeded the groundwater quality standards for a
period of three consecutive years using the statistical procedures and
performance standards in Section 811.320(e). The Agency may specify an
alternative time period during which the owner or operator must demonstrate
compliance with the groundwater quality standards. The Agency must specify
such an alternative time period by considering the following factors:
A) The extent and concentration of the releases;
B) The behavior characteristics of the hazardous constituents in
the groundwater;
C) The accuracy of monitoring or modeling techniques, including
any seasonal, meterological, or other environmental variabilities that may
affect the accuracy; and
D) The characteristics of the groundwater; and
3) All actions required to complete the remedy have been
satisfied.
f) Within 14 days after the completion of the remedy, the owner
or operator must submit to the Agency an application for a significant
modification of the permit including a certification that the remedy has been
completed in compliance with the requirements of subsection (e). The
certification must be signed by the owner or operator and by a qualified
groundwater scientist.
g) Upon Agency review and approval of the certification that the
corrective action has been completed, in accordance with subsection (e), the
Agency must release the owner or operator from the financial assurance
requirements for corrective action pursuant to Subpart G.
BOARD NOTE: Requirements of this Section are derived from 40 CFR 258.58 (2017).