35 Ill. Adm. Code 811.507
Compacted Earth Liners
Section 811
Section 811.507 Compacted
Earth Liners
a) Requirements for a Test Liner
A test full shall be constructed before construction of the
actual, full-scale compacted earth liner, in accordance with the following
requirements:
1) The test liner shall be constructed from the same soil
material, design specifications, equipment and procedures as are proposed for
the full-scale liner;
2) The test fill shall be at least four times the width of the
widest piece of equipment to be used;
3) The test fill shall be long enough to allow the equipment to
reach normal operating speed before reaching the test area;
4) At least three lifts shall be constructed;
5) The test fill shall be tested as described below for each of
the following physical properties using tests to ensure a statistically valid
sample size:
A) Field testing techniques shall be used to determine the
hydraulic conductivity.
B) Samples shall also be tested in the laboratory for hydraulic
conductivity. The laboratory results shall be evaluated to determine if there
is a statistical correlation to the field testing results.
C) Other engineering parameters, including but not limited to
particle size distribution, plasticity, water content, and in-place density,
that are needed to evaluate the full-scale liner shall be determined.
6) Additional test fills shall be constructed for each time the
material properties of a new borrow source changes or for each admixture or
change in equipment or procedures; and
b) Construction of a test fill or the requirements for an
additional test fill may be omitted if a full-scale liner or at est fill has
been previously constructed in compliance with this subsection and
documentation and is available to demonstrate that the previously constructed
liner meets the requirements of subsection (a).
c) The CQA officer shall inspect the construction and testing of
test fills to ensure that the requirements of subsection (a) are met. During
construction of the actual, full-scale compacted earth liner, the CQA officer
shall ensure the following:
1) Use of same compaction equipment as used in test fill;
2) Use of same procedures, such as number of passes and speed;
3) Uniformity of coverage by compaction equipment;
4) Consistent achievement of density, water content and
permeabilty of each successive lift;
5) Use of methods to bond successive lifts together;
6) Achievement of liner strength on sidewalls;
7) Contemporaneous placement of protective covering to prevent
drying and desiccation, where necessary;
8) Prevention of the placement of frozen material or the
placement of material on frozen ground;
9) Prevention of damage to completed liner sections; and
10) That construction proceeds only during favorable climatic
conditions.