35 Ill. Adm. Code 812.306
Design of the Liner System
Section 812
Section 812.306Â Design of
the Liner System
The application shall contain
information to show that the design of the liner system meets the minimum
requirements of 35 Ill. Adm. Code 811.306, including the following information:
a)Â Â Â Â Â Â Â Â For Compacted Clay Liners:
1)Â Â Â Â Â Â Â Â Cross sections and plan views of the liner system;
2)Â Â Â Â Â Â Â Â Results of any field or laboratory tests demonstrating that
the liner material complies with 35 Ill. Adm. Code 811.306(d);
3)Â Â Â Â Â Â Â Â A description of the test liner, including:
A)Â Â Â Â Â Â Â Diagrams and any supporting documentation showing that the test
liner will be constructed and evaluated in accordance with 35 Ill. Adm. Code
811.507(a); or
B)Â Â Â Â Â Â Â A detailed description of the test liner constructed in
accordance with 35 Ill. Adm. Code 811.507(a), if constructed prior to permit
application;
4)Â Â Â Â Â Â Â Â A description of construction methods and equipment to be
utilized; and
5)Â Â Â Â Â Â Â Â A construction quality assurance plan pursuant to 35 Ill. Adm.
Code 811.Subpart E.
b)Â Â Â Â Â Â Â Â For geomembranes:
1)Â Â Â Â Â Â Â Â A description of the physical properties of the geomembrane;
2)Â Â Â Â Â Â Â Â Documentation showing that the design of the geomembrane meets
the minimum requirements of 35 Ill. Adm. Code 811.306(e);
3)Â Â Â Â Â Â Â Â A description of the methods to seam the geomembrane in the
field in compliance with 35 Ill. Adm. Code 811.306(e)(5);
4)Â Â Â Â Â Â Â Â A plan showing the proposed layout of the individual panels
and the locations of all openings through the geomembrane;
5)Â Â Â Â Â Â Â Â A cross section and description of how openings in the
membrane will be constructed to minimize leaks; and
6)Â Â Â Â Â Â Â Â A construction quality assurance program pursuant to 35 Ill.
Adm. Code 811.Subpart E for proper construction, seaming and inspection of the
geomembrane.
c)Â Â Â Â Â Â Â Â For Slurry Trenches and Cutoff Walls:
1)Â Â Â Â Â Â Â Â A description of the slurry trench or cutoff wall, including
documentation of cross sections, material specifications and methods of
construction to demonstrate compliance with 35 Ill. Adm. Code 811.306(f);
2)Â Â Â Â Â Â Â Â Location and descriptions of the boreholes, including the results
of any testing; and
3)Â Â Â Â Â Â Â Â A construction quality assurance plan, pursuant to 35 Ill.
Adm. Code 811.Subpart E.
d)Â Â Â Â Â Â Â Â For Alternative Liner Technology:
A complete description of the technology, including
documentation demonstrating that the technology will perform as required by 35
Ill. Adm. Code 811.306(f).